FIELD: oil and gas industry.
SUBSTANCE: servicing method of the well shaft involves recovery of sealing composition containing cross-linkable material, cross-linking agent, addition preventing water absorption, water and formiate compound to shorten the time of gel formation of cross-linkable material or retarder of gel formation, which includes chemical compound which is capable of acetylating, hydrolysing, thermal decomposition of organic amine, separately or in combination, so that one or several acids are obtained in the above composition, supply of sealing composition to the permeable zone of the well shaft and exposure of sealing composition for curing. As per the second version, the method involves recovery of sealing composition by means of combination of cross-linkable material, cross-linking agent, addition which prevents water absorption, water and formiate compound to shorten the time of gel formation of cross-linkable material or retarder of gel formation, which includes chemical compound which is capable of acetylating, hydrolysing, thermal decomposition of organic amine, separately or in combination, so that one or several acids are obtained in the above composition, and cement in which the quantity of cement is decreased to effective quantity to increase the time for gel formation of sealing composition approximately to 4 hours or more at the impact of environment in the well shaft on the sealing composition. Then, sealing composition is supplied to permeable zone of the well shaft and exposure of sealing composition is performed till gel is obtained.
EFFECT: improving well sealing efficiency.
20 cl, 2 dwg, 1 tbl, 1 ex
Authors
Dates
2011-02-27—Published
2005-12-30—Filed