PROCEDURE FOR MAINTAINING PRESSURE IN BOREHOLE OF WELL (VERSIONS) AND DEVICE FOR ITS IMPLEMENTATION Russian patent published in 2011 - IPC E21B33/126 

Abstract RU 2413837 C2

FIELD: gas-and-oil producing industry.

SUBSTANCE: flexible pump-compressor pipe and movable device on it for maintaining pressure in borehole of well are used for this procedure. The procedure consists in lowering the flexible pump-compressor pipe into the borehole of the well to the first depth while the movable device is held back for maintaining pressure on surface, in advancing the pump-compressor pipe through the device for pressure maintaining, in securing the movable device for pressure maintaining in a position on the pump-compressor pipe, and in lowering the flexible pump-compressor pipe into the borehole of the well to the second depth. The device consists of a bushing for installation on the flexible pump-compressor pipe and of a released arresting unit to lock the said device on the flexible pump-compressor pipe. Also, the flexible pump-compressor pipe can be passed through the device when the arresting unit is not in a locking position.

EFFECT: improved extraction of oil or gas.

40 cl, 16 dwg

Similar patents RU2413837C2

Title Year Author Number
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
SYSTEM AND METHOD FOR POSITIONING BOTTOM-HOLE ASSEMBLY IN HORIZONTAL WELL 2011
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl
  • Misselbruk Dzhon
RU2577566C2
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL 2010
  • Skits Krejg
  • Dzhill Gari E.
  • Makhdi Abbas
RU2553705C2
METHODS, SYSTEMS AND DEVICE FOR TEST ON FLEXIBLE TUBING STRING 2006
  • Lovell Dzhon
  • Zemlak Uorren
  • Ollkorn Mark
  • Pejksoto Luis
  • Kharrison Stiven
  • Prestridzh Ehndrju
  • Tunk Gokturk
  • Ehspinosa Frehnk
RU2391502C2
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
DRILLING WITH PRESSURE OPTIMISATION BY CONTINUOUS DRILLING STRING OF LIFTING PIPES 2011
  • Majda Dzhon L. Ml.
  • Skinner Nil Dzh.
RU2565299C2
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1
DEVICES WITH COATINGS FOR OPERATION OF OIL AND GAS WELLS 2009
  • Bailey Jeffrey R.
  • Biediger Erika A. Ooten
  • Bangaru Narasimha-Rao Venkata
  • Ozekcin Adnan
  • Jin Hyunwoo
  • Yen Charles Shioa-Hsiung
  • Barry Michael D.
  • Herker Michael T.
  • Ertas Mehmet Deniz
RU2529600C2
SET OF EQUIPMENT FOR MULTI-STAGE HYDRAULIC FRACTURING 2022
  • Antipov Sergei Petrovich
  • Lebedev Artem Mikhailovich
  • Mardanshin Karim Marselevich
  • Sharafetdinov Elvir Anisovich
  • Osipov Aleksandr Sergeevich
RU2777032C1
METHOD AND DEVICE FOR DRILLING AND COMPLETION AT PROGRAMMED PRESSURE AND PROGRAMMED PRESSURE GRADIENT 2008
  • Daunton Dzheffri K.
  • Kkhan Vagar
RU2455453C2

RU 2 413 837 C2

Authors

Mur Dehril

Sherman Skott

Broklebehnk Tom

Dates

2011-03-10Published

2007-01-08Filed