FIELD: oil-and-gas industry.
SUBSTANCE: group of inventions relates to methods of preparation and treatment for well stimulation. The method of preparation of branch holes includes drilling of multiple branch holes from a vertical well. A selective injection deflector with pass-through for tubing between each respective pair of branch holes is installed. Hydraulic fracturing of multiple branch holes within one completion run by means of consecutive isolation of branch holes from multiple branch holes and supply of hydraulic fracturing fluid medium to each consistently isolated branch hole during lowering are performed.
EFFECT: improvement of efficiency of hydraulic fracturing of branch holes without lifting of equipment.
9 cl, 37 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTILATERAL WELL FORMATION | 2014 |
|
RU2655517C2 |
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING | 2012 |
|
RU2601641C2 |
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION | 2008 |
|
RU2431036C2 |
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS | 2007 |
|
RU2395667C1 |
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) | 2008 |
|
RU2412347C1 |
FORMATION HYDRAULIC FRACTURING METHOD | 2007 |
|
RU2453693C2 |
EQUIPMENT AND OPERATIONS OF MOVABLE INTERFACE UNIT | 2014 |
|
RU2645044C1 |
SYSTEM AND METHOD FOR POSITIONING BOTTOM-HOLE ASSEMBLY IN HORIZONTAL WELL | 2011 |
|
RU2577566C2 |
ACID TREATMENT PROCESS FOR INTENSIFYING THE INFLOW IN A MULTILATERAL BOREHOLE | 2019 |
|
RU2772318C1 |
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS | 2011 |
|
RU2571460C2 |
Authors
Dates
2015-06-20—Published
2010-07-26—Filed