FIELD: metallurgy.
SUBSTANCE: device consists of rotary distributing unit for distribution of loose material in shaft furnace by rotating distributing element around central axis of shaft furnace and of first, second and third hoppers arranged parallel over rotary distributing unit with set off relative to central axis of shaft furnace. At an upper part of the structure there are positioned the first, the second and the third isolating valves. Each isolating valve consists of a gate rotating between closed isolating position and open initial position. A jacket of the isolating valve has a lower part made in form of a funnel. The upper part of the jacket of the isolating valve has a star-like shape in horizontal section with the central area where inlet orifices are made next to each other on three sides around central axis of the shaft furnace; also, there are the first, the second and the third elongated sections in the upper part.
EFFECT: increased service life of installation.
15 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTI-HOPPER LOADING UNIT FOR SHAFT FURNACE | 2006 |
|
RU2415358C2 |
ASSEMBLY OF BOTTOM SEAL VALVE FOR SYSTEM OF LOADING VIA BLAST FURNACE MOUTH | 2010 |
|
RU2524870C2 |
CHARGING INSTALLATION OF HIGH FURNACE AND UNIT OF LOWER GAS SEALING VALVE | 2009 |
|
RU2491352C2 |
DEVICE FOR DISTRIBUTION OF BULK MATERIAL INTO TWO BINS, LOCATED OVER THROUAT OF BLAST FURNACE | 2004 |
|
RU2359043C2 |
LOADING DEVICE FOR SHAFT FURNACE | 2006 |
|
RU2411433C2 |
COOLING OF BULK MATERIAL | 2017 |
|
RU2762953C2 |
DISTRIBUTION CHUTE | 2011 |
|
RU2570258C2 |
APPARATUS FOR CHARGING SHAFT FURNACE | 1997 |
|
RU2118372C1 |
SHAFT FURNACE CHARGING INSTALLATION AND METHOD OF SHAFT FURNACE CHARGING | 2012 |
|
RU2605006C2 |
METERING GATE OF CHARGING FACILITY OF BLAST FURNACE | 2009 |
|
RU2396356C1 |
Authors
Dates
2011-03-10—Published
2006-12-29—Filed