FIELD: oil and gas industry.
SUBSTANCE: according to the method, they drill a directional well with a well shaft ascending end. An operating string or a shank is lowered. The ascending section of the operating string is equipped with a filter. The "dead" part of the casing string is isolated from the filter one by a packer with a coupling of stepped cementing. At the same time in the gas well the sections of pay beds are opened with the specified zenith angle - first along the descending, and then along the ascending trajectory. Thus they achieve the maximum length of pay horizon opening and speed of gas flow. Drilling mud is applied on the basis of the emulsion of gas oil and water mixture. The well shaft is cased with the operating string equipped with a filter, in the descending and ascending section of the well shaft. In the lower part of the well shaft they form the area of accumulation of bed fluid, where they lower an oil string of lifting pipes, and they carry out joint operation of pay horizons. Fluid is removed due to speed of gas flow arriving from pay beds.
EFFECT: increased efficiency of development of tight gas resources in fields, deposits of which are presented by non-consolidated mudded reservoirs with high residual water saturation and low porosity and permeability properties.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD FOR DEVELOPING MULTI-LAYER GAS DEPOSITS FIELDS WITH LOW-PERMEABILITY RESERVOIRS | 2020 |
|
RU2753334C1 |
DEVELOPMENT OF MULTI-ZONE GAS FIELD | 2013 |
|
RU2536523C1 |
METHOD FOR DEVELOPING DEPOSITS IN LAYERED RESERVOIRS | 2022 |
|
RU2787503C1 |
MULTIPAY OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2530005C1 |
DEVELOPMENT METHOD OF MULTIPAY FIELDS OF CARBONS WITH HETEROGENEOUS GEOLOGICAL CONDITIONS OF BEDDING OF PRODUCING FORMATIONS AND LAYOUT OF DOWNHOLE AND CONTROL HEAD EQUIPMENT FOR ITS IMPLEMENTATION | 2008 |
|
RU2386017C1 |
METHOD OF DEVELOPMENT OF CARBON POOL AND DEVICES FOR ITS REALISATION | 2006 |
|
RU2324048C2 |
EXPRESS METHOD FOR FIXING NATURAL AND ARTIFICIAL CRACKS IN BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION DURING THE INITIAL OPENING BY HORIZONTAL, INCLINED OR VERTICAL DRILLING | 2020 |
|
RU2755600C1 |
PROCEDURE FOR DEVELOPMENT OF GAS-HYDRATES DEPOSITS | 2010 |
|
RU2438009C1 |
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2459934C1 |
Authors
Dates
2015-08-20—Published
2014-09-03—Filed