FIELD: construction.
SUBSTANCE: in both versions, in a collapsible bridge, comprising a span with a fabricated shaped structure (according to the second version - a collapsible block structure) with metal fastening elements with a closed upper belt with a passage at the bottom, ramps and supports, the span and the ramps are made of composite materials, at least one of the span joints with the support is made as movable and adjustable.
EFFECT: high-technology and light structure, which require minimum time for installation, making it possible to compensate inaccuracies in assembly or the necessity to slightly increase or decrease length of the span, applicably to actual dimensions of the covered span, a structure having a durable repair-free service life.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SPAN | 2010 |
|
RU2422582C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
PEDESTRIAN SPAN STRUCTURE OF BRIDGE WITH MULTI-BRACED MAIN TRUSSES OF COMPOSITE MATERIALS | 2015 |
|
RU2630940C2 |
PREFABRICATED SPAN STRUCTURE | 2023 |
|
RU2814086C1 |
BRIDGE SPAN | 2009 |
|
RU2414559C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
METHOD FOR LATTICE SPAN STRUCTURE DISASSEMBLING BY SPAN STRUCTURE DIVISION INTO THREE-DIMENSIONAL BLOCKS | 2006 |
|
RU2304656C1 |
LIGHT-SPAN STRUCTURE | 2019 |
|
RU2710915C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
METHOD TO ERECT BASE PIER SECTION OF CABLE TRUSS BRIDGE SPAN CABLE-STAYED GIRDER AND PILOT BEAM TO REALISE THIS METHOD | 2011 |
|
RU2460838C1 |
Authors
Dates
2011-05-27—Published
2009-08-25—Filed