FIELD: mining.
SUBSTANCE: method involves preparation of unit and equipment, cleaning of ore from soil with high-head hydraulic flushing and its removal from the unit. At that, cleaning of ore with high-head hydraulic flushing is performed to scraper strip; then ore is transported by means of scraper installation to main roadway.
EFFECT: higher cleaning efficiency of ore fine particles.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2762170C1 |
METHOD FOR DEVELOPING LOW-POWERED STEEL ORE BODIES | 2021 |
|
RU2757619C1 |
METHOD FOR DEVELOPMENT OF NARROW SLOPING AND INCLINED ORE BODIES | 2009 |
|
RU2402681C1 |
METHOD FOR COMBINED DEVELOPMENT OF ORE | 2017 |
|
RU2659107C1 |
DEVELOPMENT METHOD OF STEEPLY-DIPPING ORE BODIES | 2008 |
|
RU2386031C1 |
DEVELOPMENT METHOD OF INCLINED ORE DEPOSITS | 2012 |
|
RU2504656C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
METHOD FOR DEVELOPMENT OF FLAT DIPPING NARROW VEINS | 2020 |
|
RU2725353C1 |
METHOD FOR DEVELOPMENT OF MINOR INCLINED AND SLOPING ORE LODES | 2009 |
|
RU2397324C1 |
METHOD OF WORKING ORE LODES | 0 |
|
SU1518520A1 |
Authors
Dates
2011-06-10—Published
2009-10-26—Filed