FIELD: oil and gas production.
SUBSTANCE: procedure consists in evacuation of fluid - water, condensate and mechanic impurities from bottomhole zone of well, in pumping reagents into oil-well tubing at closed annular space, in delivery of reagents to bottomhole of well with power of compressed air of annular space, in forcing reagents through into reservoir upon stabilisation of pressure in pipe and annular space, in evacuation of reaction products from reservoir, and in lowering and setting instrument - density metre - for record of changes of fluid density at bottomhole of well upon well shutdown. Reagents are driven into the reservoir and the bottomhole zone through orifices cut in a production string in gas medium in an interval of planned water-isolating operations, simultaneously there is supplied compressed nitrogen into annular and tube space and pressure of performed operation is controlled. The density metre is first arranged 10-15 m above lower orifices of the perforation interval, but upon pumping water-isolating reagents and upon forming a water-isolating screen a blocking solution is pumped and the density metre is positioned 100-150 m above a roof of the perforation interval to fix a level of the blocking solution. After process sedimentation calculated volume of killing fluid is refilled; its level is also measured with the density metre.
EFFECT: maintaining permeability of reservoir during repair operations.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF BOTTOM-HOLE TREATMENT | 2002 |
|
RU2222697C1 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
METHOD OF DAMPING OIL AND GAS WELLS WITH HIGHLY PERMEABLE FRACTURES OF THE HYDRAULIC FRACTURING (VARIANTS) | 2017 |
|
RU2662720C1 |
PROCESS OF ISOLATION OF INFLOW OF STRATAL WATER | 2000 |
|
RU2186935C2 |
METHOD FOR TEMPORARILY BLOCKING A PRODUCTIVE FORMATION UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2022 |
|
RU2788935C1 |
METHOD FOR INSULATION OF BOTTOM WATER INFLUX IN GAS WELLS | 2008 |
|
RU2373388C2 |
SEALING OF PIPE AND STRING CLEARANCE | 2002 |
|
RU2223386C2 |
METHOD FOR WORKING NEAR-FACE ZONE OF HOLE | 0 |
|
SU1723315A1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLOW IN WELL | 2005 |
|
RU2296209C1 |
METHOD OF DAMPING OIL AND GAS WELLS | 2017 |
|
RU2659046C1 |
Authors
Dates
2011-06-27—Published
2010-02-15—Filed