FIELD: oil and gas production.
SUBSTANCE: procedure consists in pumping water-free oil through pump unit due to its connection to pipeline of commodity oil through specially made bypass for time required for generation of bitumen-resin-paraffin film of as thick, as 50 mcm on working surfaces. Further, the pump is disconnected from the pipeline of commodity oil and oil is replaced from a cavity of the pump with water. Duration of hydrophobisation is determined beforehand under laboratory conditions by the method of "a cold rod".
EFFECT: raised efficiency and reduced expenditures.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ASPHALT-TAR-PARAFFIN, HYDRATE AND ICE PLUGS BREAKAGE IN PRODUCTION WELLS | 2006 |
|
RU2312975C1 |
METHOD OF ASPHALT-RESIN-PARAFFIN DEPOSITS FROM AN OIL WELL | 2018 |
|
RU2695724C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
MAGNETIC PROCESSING SYSTEM FOR OIL PRODUCTION | 2021 |
|
RU2781516C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRODUCER WITH TWO WELLHEADS | 2012 |
|
RU2490443C1 |
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513889C1 |
METHOD OF LAUNCHING ELECTRIC CENTRIFUGAL SUBMERSIBLE PUMP JAMMED BY SCALING IN WELL, AND PORTABLE DEVICE FOR IMPLEMENTATION THEREOF | 2017 |
|
RU2702306C1 |
STABILIZER FOR COLLECTOR PROPERTIES OF OIL FORMATION | 2006 |
|
RU2312880C1 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD OF BOTTOM HOLE PUMPING EQUIPMENT OVERHAUL PERIOD INCREASE IN PRODUCTION WELL COMPLICATED WITH SCALING | 2008 |
|
RU2375554C2 |
Authors
Dates
2011-06-27—Published
2010-02-24—Filed