FIELD: oil and gas industry.
SUBSTANCE: reactor of slow coking installation includes cylindrical shell 1 with upper 2 and lower 3 ends, annular support 21 installed on foundation 19 and demountable framework. Demountable framework consists of posts 15 the lower ends of which are rigidly installed on foundation 19, and upper ones are equipped with cantilevers 14 and connected to upper end 2 by means of tension devices with brackets 10 installed on shell 1 of reactor. On the level of upper 2 and lower 3 ends the demountable framework is attached to horizontal annular shells 16 and 17. Tension device is made in the form of spring shock absorber 12 with rod 11 and bolted connection 20.
EFFECT: invention allows relieving compression stresses in reactor walls, which are caused by proper weight and eliminating deviations of the centre of upper hatch from its vertical axis.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DECELERATED CARBONISATION REACTOR | 2013 |
|
RU2528992C1 |
REACTOR OF INSTALLATION FOR RETARDED COKING | 2010 |
|
RU2426764C1 |
SLOW COKING REACTOR | 2008 |
|
RU2367680C1 |
REACTOR OF INSTALLATION FOR RETARDED COKING | 2013 |
|
RU2531184C1 |
REACTOR FOR FUEL COKE | 2010 |
|
RU2434047C1 |
PROCEDURE FOR PROCESSING OIL RESIDUES BY DELAYED COKING AND COKING REACTOR | 2010 |
|
RU2437916C1 |
COKE CHAMBER WITH INNER HEAT-PROTECTING LAYER | 0 |
|
SU863615A1 |
DEVICE FOR INPUT OF PROCESS STREAMS INTO DELAYED COKING REACTOR | 2023 |
|
RU2814261C1 |
METHOD FOR UNLOADING COKE SHOTS FROM REACTOR AND PLANT FOR IMPLEMENTATION OF THIS METHOD | 2016 |
|
RU2635221C1 |
APPARATUS FOR HYDRAULIC REMOVAL OF OIL COKE FROM SLOW COKING REACTORS | 2015 |
|
RU2592594C1 |
Authors
Dates
2011-07-27—Published
2010-01-28—Filed