FIELD: machine building.
SUBSTANCE: procedure consists in laying pipeline into ditch, also, pipeline is laid from bundle on drum, in soil fill, and in connection of straight branch with flexible sleeve through coupling. The pipeline is directed through the straight branch on a bottom of the ditch and is transferred along the ditch by means of a device for lengthwise transfer. Soil is back filled over the place of the straight branch location; also, length L of the straight branch and diameter D of the pipeline bundle are chosen from ratio: L>1.5πD.
EFFECT: raised efficiency and reduced curves at laying pipeline in ditch.
2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND PIPELINE ROUTING METHOD, AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2472053C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD OF LAYING PIPE-LINE WITH NEGATIVE BUOYNCY | 0 |
|
SU1427141A1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
DEVICE FOR PROTECTING ANCHORS FROM PIPELINES | 2003 |
|
RU2245475C2 |
METHOD TO INSTALL PIPELINE IN WATERLOGGED AREA | 2011 |
|
RU2465508C1 |
METHOD TO BUILD COMPLEX OF PIPELINES | 2011 |
|
RU2489631C2 |
UNDERGROUND PIPELINE ROUTING METHOD | 2011 |
|
RU2467240C1 |
METHOD LAYING UNDERGROUND PIPE LINE | 1995 |
|
RU2090795C1 |
METHOD FOR LAYING PIPELINES IN UNSTABLE GROUNDS | 0 |
|
SU1652727A1 |
Authors
Dates
2011-07-27—Published
2010-06-08—Filed