FIELD: construction.
SUBSTANCE: construction material on the basis of a mixture of bore mud with mineral additives, representing the specified mixture, which is thermally treated in flame of gas torch during gas-hydrodynamic survey and additionally contains a spent process solution, drilling waste water produced as a result of boring works, and mineral additives are loamy soil and/or sand and/or sand-clay fraction at the following ratio of components, wt %: bore mud 30.0-75.0, spent process solution 1.0-45.0, specified mineral additive 0.1-50.0, specified drilling waste water - balance.
EFFECT: increased extent of environment protection, natural resources saving, reduced prime cost, production of cheap environmentally safe construction material, which binds contaminants in its structure.
2 cl, 5 ex
Title | Year | Author | Number |
---|---|---|---|
MIXTURE FOR PRODUCING CONSTRUCTION MATERIAL | 2009 |
|
RU2439018C2 |
MIXTURE FOR MANUFACTURE OF CONSTRUCTION MATERIAL | 2009 |
|
RU2399440C1 |
WELL DRILLING WASTE UTILISATION METHOD | 2010 |
|
RU2425815C1 |
PROCEDURE FOR SUMP BUILDING AT CONSTRUCTION OF OIL-GAS CONDENSATE DEPOSITS | 2010 |
|
RU2431733C1 |
POLYMER-STABILIZED MICRODISPERSED DRILLING COMPOSITION | 2023 |
|
RU2806712C1 |
DRILLING AGENT FOR DEVIATING HOLES | 2007 |
|
RU2369625C2 |
NON-DISPERSING MUD | 2013 |
|
RU2541664C1 |
SYNTHETIC DRILLING SOLUTION | 2017 |
|
RU2655311C1 |
CLAY-FREE DRILLING FLUID FOR COMPLETION OF FORMATIONS OF CONTROLLED DIRECTIONAL AND HORIZONTAL WELLS IN CONDITIONS OF ABNORMALLY HIGH FORMATION PRESSURES | 2010 |
|
RU2440397C1 |
DRILLING FLUID FOR FLUSHING OF LONG-DISTANCE STEEPLY INCLINED WELLS UNDER CONDITIONS OF PERMAFROST AND HIGHLY COLLOIDAL CLAY ROCKS, AND ITS APPLICATION METHOD | 2011 |
|
RU2483091C1 |
Authors
Dates
2011-08-20—Published
2010-07-05—Filed