FIELD: oil and gas production.
SUBSTANCE: procedure consists in digging foundation pit in soil and in hydro-insulation of its cavity. Also, here there is used processing waste of drilling in form of mixture of spent process solution with cuttings - slime. Preliminary, waste is mixed with sand till obtaining uniform mass, at ratio: sand 50-80%, spent drill agent with slime 20-50%. Further, solid phase is mixed with sand to a condition of a soft clay and produced mixture is cured during 10-15 hours. Successively, cured mixture is transported to a prepared from sand foundation pit-sump of gas-flare (sump of GF). A bottom and internal slopes of sump of GF surface are lined with this mixture at height of at least 0.5 m. The cavity of the GF sump is hydro-isolated. Its strengthened structure is formed through process specified gas-hydro-dynamic analysis of a well followed with combustion of gas flare, by means of which the constructed bottom and internal slopes of GF sump surface are thermally burned in a flare flame.
EFFECT: reduced prime cost and increased reliability of ecological safety of environment.
4 cl
Title | Year | Author | Number |
---|---|---|---|
WELL DRILLING WASTE UTILISATION METHOD | 2010 |
|
RU2425815C1 |
METHOD FOR CONSTRUCTING A PIT FOR A HORIZONTAL FLARE | 2021 |
|
RU2769622C1 |
CONSTRUCTION MATERIAL | 2010 |
|
RU2426708C1 |
SOIL-SLIME MIX | 2013 |
|
RU2522317C1 |
PROCESSING METHOD OF DRILLING WASTES ON TERRITORY OF CLUSTER SITE | 2013 |
|
RU2551564C2 |
IMPROVED ROAD-BUILDING SOIL | 2013 |
|
RU2541009C2 |
ROAD-BUILDING COMPOSITE MATERIAL | 2013 |
|
RU2551560C2 |
DRILLING REJECT BURIAL METHOD | 2001 |
|
RU2201949C2 |
METHOD FOR RECYCLING OF MINES AND WELLS CONSTRUCTION WASTES | 2009 |
|
RU2399439C1 |
METHOD OF RECOVERY OF MINE WORKING AND WELL CONSTRUCTION | 2009 |
|
RU2428266C2 |
Authors
Dates
2011-10-20—Published
2010-08-26—Filed