FIELD: oil and gas production.
SUBSTANCE: well pumping unit for simultaneous separate development of two reservoirs in well consists of lifting string, of cable, of packer, of by-pass, of two pumps, lower of which is electric immersed, while upper one is encased. The packer is equipped with a unit for sealing a cable and with a split coupling; the lower pump is located in under-packer space; also, output of the lower pump is communicated with a case of the upper pump via the packer by means of inter-pump pipe string; the by-pass is located on it below the packer.
EFFECT: simplified design and raised reliability of pump unit operation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
PUMP DEVICE FOR SIMULTANEOUS SEPARATE OPERATION OF TWO BEDS IN A WELL | 2005 |
|
RU2291953C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS | 2019 |
|
RU2722174C1 |
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS | 2009 |
|
RU2405925C1 |
PUMPING UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO RESERVOIRS IN WELL | 2010 |
|
RU2405924C1 |
PUMPING UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO RESERVOIRS IN WELL | 2010 |
|
RU2405923C1 |
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION | 2008 |
|
RU2381352C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR | 2024 |
|
RU2825381C1 |
PUMP INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO BEDS IN WELL | 2008 |
|
RU2369730C1 |
Authors
Dates
2011-08-27—Published
2010-05-24—Filed