FIELD: electrical engineering.
SUBSTANCE: proposed device comprises track generator, three matching transformers, two rail lines, two rectifiers, two ADCs, for PROMs, four registers, three comparators, four AND elements, five triggers, clock signal generator, and track receiver. Additionally, proposed device incorporates two rail lines, three resistors, five ban filters, two rectifiers, four smoothing filters, two ADCs, one register, seven ABD elements, three OR elements, one comparator, two counters, three triggers, occupancy pulse generator, clearing pulse generator and three track receivers. Track receiver consists of threshold voltage generator, rail line control unit and auxiliary signal generator.
EFFECT: higher reliability of control.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR RAIL LINE CONDITION MONITORING | 2007 |
|
RU2340499C2 |
TRACK CIRCUIT | 2006 |
|
RU2331538C1 |
DEVICE TO CONTROL TRACK STATE | 2011 |
|
RU2466896C1 |
METHOD FOR CONTROLLING OF RAILWAY TRACK UTILIZATION AND DEVICE FOR CONTROLLING INGRESS OF ROLLING STOCK TO RAILWAY TRACK | 1991 |
|
RU2025356C1 |
DEVICE AND METHOD TO CONTROL TRACK UNOCCUPANCY | 2009 |
|
RU2423265C2 |
METHOD AND DEVICE TO DETERMINE TRAIN SHUNT RESISTANCE | 2008 |
|
RU2369507C1 |
DEVICE TO CONTROL TRACK STATE | 2012 |
|
RU2481989C1 |
METHOD TO CONTROL TRACK STATE AND DEVICE TO THIS END | 2008 |
|
RU2392153C2 |
TRACK CIRCUIT | 2004 |
|
RU2259295C1 |
TRACK CIRCUIT | 1991 |
|
RU2025359C1 |
Authors
Dates
2011-09-27—Published
2010-01-11—Filed