FIELD: oil and gas production.
SUBSTANCE: wellhead assembly is dismantled up to a casing head CH with a bridge plug mounted in a supplementary string SS. A portion of a zero nipple is cut off and removed, and the CH is set with a skip hanger being detached. The CH is renewed, and the skip hanger and primary seals are fixed therein. If a cement stone is placed at the level of an upper border of the SS, upper portions of the production casing and the supplementary string are cut off, and a spacer ring is placed in between and covered with a sealing compound, and a thrust bush is threaded on the SS. If the cement stone is placed below a false coupling of the SS, it shall be unscrewed and replaced by a twin pin body whereon a landing adapter is threaded with its bottom resting against in an end face of the cut off production casing and with its top placed in a seat for secondary seals; thereafter an assembly of a lower "ТГ" and secondary seals of the proper dimensions is mounted. If the cement stone is placed in a space between the end face of the SS and the false coupling of the SS, tops of the PC and the SS are cut off, while a tube space is filled with a sealing composition. An assembly of a renewed bottom "ТГ" and the secondary seal is mounted on the renewed CH. The other wellhead assembly is installed as specified by a routine procedure.
EFFECT: maintainability enhancement.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR WELLHEAD RE-MANIFOLDING | 2010 |
|
RU2434117C1 |
METHOD OF OIL AND GAS WELL ABANDONMENT WITH MULTIPLE UNSEALED INTERVALS IN OPERATION COLUMN IN ROUGH TERRAIN | 2010 |
|
RU2439288C1 |
RE-EQUIPMENT OF SELF-SQUEEZING GAS WELL HEAD | 2013 |
|
RU2524787C1 |
METHOD OF ABANDONMENT OF OIL-AND-GAS WELL WITH PRODUCTION STRING MULTIPLE UNTIGHT SECTIONS | 2010 |
|
RU2441135C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR | 2009 |
|
RU2418152C1 |
PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF LEAKAGE OF PRODUCTION STRING | 2010 |
|
RU2436932C1 |
METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING | 2009 |
|
RU2403376C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
METHOD OF HYDROLIC FRACTURING OF FORMATION OF CONDENSATE BOREHOLE | 2006 |
|
RU2324050C2 |
Authors
Dates
2011-11-10—Published
2010-04-29—Filed