FIELD: oil and gas production.
SUBSTANCE: procedure consists in disassembly of production tree of control equipment - CE together with sub spool of tube head -TH; lifting string is extracted from well. A cement bridge is set in a flow string. The case of the TH is disassembled, upper and middle parts of a zero branch are cut off and a cut off part is removed. The HS (head spool) is set on an end of the remained section of the zero branch, a wedge suspension is disconnected and the HS is removed from the wellhead. A sub for matching a conductor and the zero branch is screwed on the conductor; the conductor and the zero branch have different diametres. The wedge suspension is installed into the HS and there is installed the TH. The lifting spring is installed in the well. Production tree of the CE is mounted on the sub spool of the TH.
EFFECT: increased serviceability.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONNECTIONS OF WELLHEAD WITH SUPPLEMENTARY STRINGS (VERSIONS) | 2010 |
|
RU2433247C1 |
RE-EQUIPMENT OF SELF-SQUEEZING GAS WELL HEAD | 2013 |
|
RU2524787C1 |
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR | 2009 |
|
RU2418152C1 |
METHOD OF ABANDONMENT OF OIL-AND-GAS WELL WITH PRODUCTION STRING MULTIPLE UNTIGHT SECTIONS | 2010 |
|
RU2441135C1 |
METHOD OF OIL AND GAS WELL ABANDONMENT WITH MULTIPLE UNSEALED INTERVALS IN OPERATION COLUMN IN ROUGH TERRAIN | 2010 |
|
RU2439288C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
METHOD OF SUSPENDING STEEL POLYMER FLEXIBLE FLUSH-JOINT PIPE IN WELL | 2015 |
|
RU2601078C1 |
METHOD OF HYDROLIC FRACTURING OF FORMATION OF CONDENSATE BOREHOLE | 2006 |
|
RU2324050C2 |
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL | 2005 |
|
RU2306412C1 |
Authors
Dates
2011-11-20—Published
2010-04-30—Filed