FIELD: process engineering.
SUBSTANCE: proposed device consists of top barrel 3 arranged in bottom, bottom barrel 7 arranged under said top barrel 3, and gas tight body 14. Wall of through hole 9 to allow flow via barrels 3 and 7 is sealed with respect to fused metal flow. Seals are provided between movable and fire resistant parts of the device. Barrels 3 and 7 are partially surrounded by gas tight body 14. Said body 14 has its bottom edge seals bottom barrel 7 along its edges and has its inner side partially adjoining outer side of barrel 7. Heat insulation material is fitted between through hole wall and body 14.
EFFECT: minimised sticking of deposits in discharge device barrel channels.
7 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FLOW REGULATION, AND ALSO BOTTOM ESCAPEMENT DEVICE FOR METALLURGICAL TANK | 2005 |
|
RU2381869C2 |
POURING NOZZLE AND MOUNTING ASSEMBLY INCLUDING IT | 2010 |
|
RU2551742C2 |
TEEMING DEVICE FOR CONTINUOUS CASTING OF STEEL | 2006 |
|
RU2404019C2 |
TOOL FOR DETERMINING STATE OF PLATES | 2020 |
|
RU2819598C2 |
SELF-LOCKING SYSTEM OF THE INTERNAL POURING NOZZLE | 2018 |
|
RU2760749C1 |
DEVICE TO BLOW METAL MELT WITH GAS THROUGH A WALL OF METALLURGIC RESERVOIR CONTAINING THE MELT | 0 |
|
SU1838430A3 |
APPARATUS FOR BLOWING SMELTS IN METALLURGICAL SPACE | 1990 |
|
RU2091495C1 |
ASSEMBLY OF BOTTOM PLATE OF GATE, CONTAINING BAYONET-FREE MOUNTING OF COLLECTOR CUP | 2018 |
|
RU2771730C2 |
0 |
|
SU1563840A1 | |
APPARATUS FOR CONTINUOUS CASTING OF METAL | 1990 |
|
RU2022691C1 |
Authors
Dates
2011-11-20—Published
2009-09-21—Filed