FIELD: construction.
SUBSTANCE: crane rail is manufactured from a steel tape produced by form rolling. The crane rail has an upper belt and a lower belt. On the upper belt there is an additional carrier belt, which is triangular in cross section. Edges of the steel tape are welded to a crosslink by means of laser welding. Special reinforcement is designed to fix the crane rail.
EFFECT: development of a rail with improved properties, which is installed in a more simple manner.
31 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SIDE WALL OF CAR AND METHODS OF ITS ASSEMBLING (VERSIONS) | 2004 |
|
RU2271293C2 |
REHABILITATION METHOD OF WELDING CRANE BEAM DAMAGED WITH FATIGUE CRACKS | 2009 |
|
RU2460621C2 |
METHOD OF REPAIRING CRANE-RUNWAY GIRDER | 0 |
|
SU1542767A1 |
CRANE RUNWAY STRENGTHENING METHOD | 1994 |
|
RU2114045C1 |
BOX-SHAPED GIRDER, IN PARTICULAR CRANE GIRDER, AND CRANE AND METHOD FOR THEIR MANUFACTURE | 2019 |
|
RU2747241C1 |
METHOD TO INCREASE RESOURCE OF CRANE GIRDER | 2012 |
|
RU2527597C2 |
METHOD OF REPARING CRANE GIRDERS | 0 |
|
SU1333522A1 |
INSTALLATION FOR CONNECTING METAL BANDS | 1997 |
|
RU2201858C2 |
COMBINED PROFILE WITH BEARING ELEMENT OUT OF MATERIAL ON BASE OF LIGHT METAL AND SURFACE MOUNTED BAND, ALSO METHOD OF FABRICATION OF THIS COMBINED PROFILE | 2005 |
|
RU2384426C2 |
RAIL UNIT AND METHOD OF RESTORATION OF SERVICEABILITY OF CRANE TRACK STRUCTURE | 2000 |
|
RU2213041C2 |
Authors
Dates
2011-11-27—Published
2007-11-08—Filed