MULTILATERAL WELL AND METHOD, AND SYSTEM USING THIS WELL Russian patent published in 2011 - IPC E21B7/08 E21B43/24 

Abstract RU 2436925 C2

FIELD: mining.

SUBSTANCE: well system on the basis of multilateral well includes the main borehole drilled from ground surface to productive formation. The first and the second transverse boreholes are branched from the main borehole. The main borehole includes attachment point of shank that has the first branch included in the first transverse borehole and the second branch deviating downwards along the main borehole. Working fluid medium delivery pipe string passes from the main borehole through the attachment point of shank to the first transverse borehole and ends in it. The sealer in the first transverse borehole prevents formation of flow in annular space, which is directed to the main borehole, which adjoins the external surface of delivery pipe string.

EFFECT: invention allows using concentric location of pipes for steam delivery to the well via internal pipeline and for oil removal via annular space between pipes and continuity of pressures at joints of boreholes of multilateral well is maintained at the temperature corresponding to the temperature at the well bottom.

22 cl, 4 dwg

Similar patents RU2436925C2

Title Year Author Number
SYSTEM (VERSIONS) AND DETECTION METHOD OF ACOUSTIC SIGNALS SUPPLIED FROM WELL 2008
  • Glejtman Dehniel D.
  • Shul'Ts Rodzher L.
  • Pipkin Robert L.
RU2446279C2
METHOD FOR CONSTRUCTION AND COMPLETION OF FORCE WELLS 2003
  • Dzhonson Majkl Kh.
RU2291284C2
SYSTEM (VERSIONS) AND PROCEDURE FOR PRODUCTION OF NATURAL RAW STOCK BY INJECTION OF HEATED FLUID MEDIUM 2008
  • Kavender Trejvis V.
  • Shul'Ts Rodzher L.
RU2422618C1
METHOD FOR INTERPRETING WELL YIELD MEASUREMENTS DURING WELL TREATMENT 2011
  • Veng Sjaovej
  • Tardi Filipp M.Zh.
  • Pipchuk Duglas
  • Bergos Reks
  • Tomer Khubertus V.
  • Kuejk Robert Van
  • Moskato Tullio
RU2577568C1
WELL COMPLETION IN ONE PRODUCTION STRING RUNNING 2003
  • Luis Ehdvin K.
  • Orchard Antoni Dzh.
  • Jeo Dzhozef K. Kh.
  • Krittsler Dzhejms Kh.
  • Chapman Uolter R.
  • Kholt Dzhejms Kh. Dzhr.
RU2349735C2
OPTIMISED COOLING OF ELECTRIC MOTOR IN PUMP COMPRESSOR FORMATION 2014
  • Diaz Carlos E.
  • Oyarzun Raul Alejandro
  • Teves Ricardo Hector
  • Collins Charles
RU2686971C2
WELL FOR PRODUCTION OF HYDROCARBONS AND METHOD OF WELL CONSTRUCTION 2016
  • Joshi Mahendra L.
  • Qi Xuele
  • Murphy Raymond Patrick
  • Parkey Dewey Lavonne
RU2718455C2
WELL GAS-TURBINE-NUCLEAR OIL-AND-GAS PRODUCING COMPLEX (PLANT) 2017
  • Ilyusha Anatolij Vasilevich
  • Ambartsumyan Garnik Levonovich
  • Pankov Dmitrij Anatolevich
  • Groshev Igor Vasilevich
  • Grushchenko Anatolij Vasilevich
  • Nechaev Dmitrij Ivanovich
RU2652909C1
SYSTEM AND PROCEDURE FOR GENERATION OF ALTERNATE FLOW OF FLUID IN WELL 2008
  • Shul'Ts Rodzher L.
  • Kavender Trejvis V.
  • Pipkin Robert L.
  • Glejtman Dehniel D.
RU2427706C1
SYSTEM FOR CHEMICAL INJECTION INTO WELL, OIL WELL FOR OIL PRODUCT EXTRACTION (VARIANTS) AND OIL WELL OPERATION METHOD 2001
  • Stedzhemejer Dzhordzh Leo
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml
  • Khersh Dzhon Mishel'
RU2258805C2

RU 2 436 925 C2

Authors

Shul'Ts Rodzher L.

Kavender Trejvis V.

Fipke Stiven Ronal'D

Deshmukh Ehdajtja Shajlesh

Stil Dehvid Dzho

Veles Khorkhe Ehnrike

Rosas Fermin Ehulalio

Dates

2011-12-20Published

2008-07-03Filed