METHOD FOR INTERPRETING WELL YIELD MEASUREMENTS DURING WELL TREATMENT Russian patent published in 2016 - IPC E21B47/10 

Abstract RU 2577568 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes stages whereat arrangement of drill string lower part (ADSLP) is placed in the borehole. At that ADSLP contains an injection port for delivery of fluid to the wells, the first sensor placed above the injection port and the second sensor placed below the injection port. Each sensor out of the first and second sensors generates feedback signal representing the rate of fluid flow at the borehole section. Approximate depth of ADSLP is measured in the borehole. Data model is formed on the basis of a set of instructions, at that the data model represents characteristics of fluid flow in the borehole; moreover the data model is received against feedback signal and approximate depth of the injection port. The data model is analysed for the purpose of extrapolation of the formation characteristics.

EFFECT: efficiency of simulation treatment due to received knowledge on distribution of flow within the operating range in real time.

20 cl, 3 dwg

Similar patents RU2577568C1

Title Year Author Number
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES 2013
  • Kress Olga
  • Ven Syaovej
  • Gu Khunzhen
RU2591857C1
SYSTEM AND METHOD OF OPTIMISATION OF PRODUCTION IN WELL WITH ARTIFICIAL LIFTING 2004
  • Kadmor Dzhulian R.
  • Khaskell Dzhulian B.
  • Miranda Frehnsis Ks. T.
RU2366804C2
SYSTEM, METHOD AND COMPUTER-READABLE CARRIER WITH COMPUTER PROGRAMME FOR PREDICTING BOREHOLE GEOMETRY 2011
  • Mitchell Ajan Dehvid Kehmpbell
  • Strehchen Majkl Dzhon Makleod
RU2560462C2
SYSTEM AND METHOD OF CORRECTION OF WELL SHAFT DIRECTION BASED ON STRESS FIELD 2008
  • Mus Daniel
  • Khassan Gamal' A.
  • Dzhordzhi Daniel T.
  • Kastillo Dejvid A.
  • Fejb'An Dzhon
RU2496003C2
METHOD FOR OPTIMISING EXTRACTION FROM WELL WITH ARTIFICIAL LIFTING 2004
  • Kadmor Dzhulian R.
  • Khaskell Dzhulian B.
  • Miranda Frehnsis Ks. T
RU2496974C2
IMPROVED WELLBORE SIMULATION METHOD 2013
  • Leserf Bryuno
  • Ramondenk Per
  • Tardi Filipp M.Zh.
RU2621230C2
METHOD FOR CONSTRUCTION AND COMPLETION OF FORCE WELLS 2003
  • Dzhonson Majkl Kh.
RU2291284C2
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE 2018
  • Fatkhullin Salavat Tagirovich
  • Bortnikov Andrej Vitalevich
  • Bikchurin Ramil Faritovich
  • Frolov Denis Vladimirovich
RU2698354C1
DEVICES WITH COATINGS FOR OPERATION OF OIL AND GAS WELLS 2009
  • Bailey Jeffrey R.
  • Biediger Erika A. Ooten
  • Bangaru Narasimha-Rao Venkata
  • Ozekcin Adnan
  • Jin Hyunwoo
  • Yen Charles Shioa-Hsiung
  • Barry Michael D.
  • Herker Michael T.
  • Ertas Mehmet Deniz
RU2529600C2
FRACTURE EVALUATION THROUGH CASED BOREHOLES 2014
  • Mekits Natasha
  • Patterson Duglas Dzh.
RU2652394C2

RU 2 577 568 C1

Authors

Veng Sjaovej

Tardi Filipp M.Zh.

Pipchuk Duglas

Bergos Reks

Tomer Khubertus V.

Kuejk Robert Van

Moskato Tullio

Dates

2016-03-20Published

2011-12-06Filed