FIELD: construction.
SUBSTANCE: group of inventions relates to construction of wells for production of hydrocarbons. Method comprises drilling vertical branch at first preset depth to form wellbore. Vertical branch is widened at location of joint unit in vertical branch to form first connecting section. Binding material is introduced into first connecting section. Side branch is drilled at the first specified distance through the side wall of the first connecting section. Side branch is widened through the side wall of the first connecting section to form the second connecting section. Binding material is introduced into the first connecting section and the second connecting section to form a connection unit between the vertical branch and the side branch.
EFFECT: technical result is higher efficiency of construction of wells and reliability of device operation.
15 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL | 2010 |
|
RU2553705C2 |
SYSTEM FOR CHEMICAL INJECTION INTO WELL, OIL WELL FOR OIL PRODUCT EXTRACTION (VARIANTS) AND OIL WELL OPERATION METHOD | 2001 |
|
RU2258805C2 |
OIL WELL (VARIANTS), OPERATION METHOD THEREFOR AND TRACER ISOTOPE INJECTION SYSTEM USED IN THE WELL | 2001 |
|
RU2263783C2 |
PLUG DEFLECTOR FOR BOREHOLE INSULATION IN MULTI-SHAFT WELL SYSTEM | 2016 |
|
RU2722321C1 |
HORIZONTAL VERTICAL PUMP SYSTEM FOR EXTRACTING WELL FLUID MEDIUM | 2012 |
|
RU2650983C2 |
ENERGY TRANSMISSION MECHANISM FOR A CONNECTION JOINT FOR CONNECTION WITH A LATERAL WELL FINISHING TOOL | 2017 |
|
RU2745682C1 |
SAMPLING DEVICE AND METHODS OF SAMPLES OF FORMATION FLUID MEDIUM | 2007 |
|
RU2436951C2 |
MULTILATERAL WELL AND METHOD, AND SYSTEM USING THIS WELL | 2008 |
|
RU2436925C2 |
INTERSECTION OF MULTI-SHAFT WELL WITH USE OF MECHANICAL ELEMENTS OF STIFFENESS | 2014 |
|
RU2643248C1 |
COMPLETION DEFLECTOR FOR INTELLIGENT WELL COMPLETION | 2014 |
|
RU2649711C1 |
Authors
Dates
2020-04-06—Published
2016-07-13—Filed