FIELD: oil and gas industry.
SUBSTANCE: pipe string equipped with packer and control device is lowered to the well. Pipe string or control device is equipped with measuring converter at the formation level. The well is equipped with intelligent control system of production of hydrocarbons and maintenance of formation pressure (ICS). ICS is located at formation level immediately at the measuring converter or control device. Information on measurement of parameters is supplied to ICS through communication interface with measuring converter, where preliminary processing of input information is performed. Analysis of the supplied information is performed in compliance with programme algorithm. Control signal is shaped for the control device in compliance with the specified opening or closing rate of control device. At that, reception and transmission of control data is performed. Simultaneous separate well operation device includes measuring device, control device and ICS. ICS includes analysis and logic unit, communication interfaces with measuring converter and with control device. At that, ICS is installed on the formation level immediately at measuring converter or control device and electrically related to them.
EFFECT: improving response accuracy of actuators, enlarging functional capabilities of the device, increasing efficiency of the operating technology and reducing time costs.
8 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION | 2006 |
|
RU2313659C1 |
METHOD OF SIMULTANEOUSLY-SEPARATE DOWNLOADING OF THE WORKING AGENT, INSTALLATION AND REGULATORY DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2681719C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
METHOD OF DUAL COMPLETION OF SEVERAL PRODUCTIVE HORIZONS AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2449114C1 |
VISUALISED LOGGING AND DEVICE TO THIS END (VERSIONS) | 2013 |
|
RU2520977C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
BOREHOLE UNIT WITH FIELD EXPLOITATION MONITORING AND CONTROL SYSTEM | 2014 |
|
RU2569390C1 |
METHOD OF EXTRACTING FLUID FROM RESERVOIR OF ONE WELL WITH ELECTRIC DRIVE PUMP EQUIPPED WITH ELECTRIC VALVE AND INSTALLATION FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2385409C2 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF THREE BEDS WITH ONE WELL | 2009 |
|
RU2399749C1 |
Authors
Dates
2012-01-20—Published
2009-08-24—Filed