METHOD FOR WELL DEVELOPMENT Russian patent published in 2012 - IPC E21B43/25 E21B43/18 

Abstract RU 2447277 C1

FIELD: oil and gas industry.

SUBSTANCE: tubing string is installed in a well with arrangement of its bottom below a producing bed by 1-2 m. The well is flushed. An assembly is formed from the tubing string, a sub with a process hole and a hollow-carrier perforator, the assembly is lowered with arrangement of the perforator in the producing bed interval, perforation is carried out, the tubing string is lowered to match the sub process hole with the perforation interval foot. Using the tubing string, 10-20% solution of hydrochloric acid containing 3.5-5% of a surfactant is delivered to the well bottomhole. A pipe valve is opened at the wellhead, and pressure is increased in the tubing string for 1-3 min. until the value is not more than 6 MPa. The pipe valve is closed. The tube valve is opened, and pressure is discharged via the tubular space. Cycles of pressure rising in the tubing string are repeated for 1-3 min, and pressure is discharged via the tubular space until the time interval to achieve the pressure of 6 MPa increases over 3 min. The fluid from the tubing string is squeezed into the bed, and from the tubular space - to the well bottomhole area. The well is put in operation.

EFFECT: increased efficiency of deposits development.

3 ex

Similar patents RU2447277C1

Title Year Author Number
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL 2009
  • Khisamov Rais Salikhovich
  • Shafigullin Rinat Il'Dusovich
  • Torikova Ljubov' Ivanovna
  • Isakov Vladimir Sergeevich
  • Musaev Gajsa Lemievich
RU2398960C1
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS 2020
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustiamovich
RU2750004C1
HORIZONTAL WELL COMPLETION METHOD 2015
  • Ibragimov Nail Gabdulbarievich
  • Sagatov Ramis Fanisovich
  • Aslyamov Ajrat Ingelevich
  • Garaev Rafael Rasimovich
  • Absalyamov Ruslan Shamilevich
RU2588108C1
WELL COMPLETION METHOD 2018
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustyamovich
RU2695908C1
METHOD OF THERMOFOAM-ACID TREATMENT OF NEAR-WELL ZONE OF CARBONATE RESERVOIR 2016
  • Ismagilov Fanzat Zavdatovich
  • Khabibrakhmanov Azat Gumerovich
  • Novikov Igor Mikhajlovich
  • Latypov Rustam Robisovich
  • Nafikov Askhat Akhtyamovich
  • Podavalov Vladlen Borisovich
  • Nigmatullin Marat Makhmutovich
  • Gavrilov Viktor Vladimirovich
  • Nigmatullin Ilsur Magsumovich
  • Musabirov Munavir Khadeevich
  • Abusalimov Eduard Marsovich
  • Dmitrieva Alina Yurevna
  • Musabirova Natalya Mikhajlovna
  • Orlov Evgenij Grigorevich
  • Yarullin Rinat Ravilevich
RU2638668C1
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Kuzjaev Ehl'Mir Sattarovich
  • Apasov Renat Timergaleevich
RU2539047C1
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION, LOCATED IN ISOLATION FROM WATER-BEARING FORMATION 2015
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustyamovich
RU2593281C1
METHOD FOR PERFORATING A WELL AND PROCESSING A BOTTOM-HOLE CARBONATE FORMATION ZONE 2017
  • Gazizov Ilgam Garifzyanovich
  • Salikhov Ajrat Dufarovich
  • Kurbanov Akhmadali Dzhalilovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2656255C1
WELL COMPLETION METHOD 2014
  • Khisamov Rais Salikhovich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
RU2541988C1
METHOD OF INTERVAL TREATMENT OF BOTTOM HOLE ZONE OF HORIZONTAL WELL SHAFT 2015
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2599156C1

RU 2 447 277 C1

Authors

Ibragimov Nail' Gabdulbarievich

Isakov Vladimir Sergeevich

Torikova Ljubov' Ivanovna

Musaev Gajsa Lemievich

Dates

2012-04-10Published

2011-05-27Filed