FIELD: mining.
SUBSTANCE: method to produce a mineral is carried out by continuous grinding of ore by the continuous drill and blast method in stepped spiral entries with subsequent withdrawal of the mineral. The tunnelling cycle of a drill and blast tunnel is carried out from a finished entry with a previous turn to the side of future tunnelling of this entry by means of serial operations of the drill and blast method, as spiral entries advance, with completion of a tunnelling operation within a complete turn by transfer of blasted rock, where blasting took place at considerable distance into a released space with continuous extraction of the mineral.
EFFECT: increased efficiency, reduced prime cost in production of minerals, higher safety.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
RECOVERY METHOD OF MINERALS | 2008 |
|
RU2367794C1 |
RECOVERY METHOD OF MINERALS | 2008 |
|
RU2367793C1 |
METHOD FOR KIMBERLITE PIPE | 2018 |
|
RU2691032C1 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
METHOD FOR COMBINATION DEVELOPMENT OF DEPOSITS | 1998 |
|
RU2132950C1 |
METHOD FOR WORKING GENTLY-SLOPING THICK DEPOSITS WITH UNSTABLE ROCKS | 0 |
|
SU926294A1 |
METHOD FOR ORE BODY CONTINUOUS WORKING | 0 |
|
SU1739033A1 |
METHOD FOR DEVELOPMENT OF FLAT DIPPING NARROW VEINS | 2020 |
|
RU2725353C1 |
METHOD FOR OPENCAST DEVELOPMENT OF DEPOSITS | 1998 |
|
RU2127809C1 |
METHOD FOR WORKING THICK ORE DEPOSITS | 0 |
|
SU901529A1 |
Authors
Dates
2012-04-10—Published
2010-08-19—Filed