FIELD: machine building.
SUBSTANCE: heat source in the form of heated medium with temperature above fluid temperature in pipeline is applied to pipeline surface; time diagram of bar temperature variation at absence of temperature gradient about heated medium near it is picked up. At that, in order to eliminate temperature gradient on pipeline surface near the heated medium about it on the pipeline there installed is additional heat source in the form of a ring.
EFFECT: higher accuracy for determining the thickness of deposits on internal surface of pipelines; enlarging the area of possible application.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF THICKNESS OF MUD-AND-PARAFFIN DEPOSITS IN OIL LINE | 1996 |
|
RU2099632C1 |
METHOD FOR DETERMINATION OF DEPOSITS THICKNESS ON INTERNAL SURFACE OF PIPELINES | 2007 |
|
RU2344338C1 |
METHOD OF DETERMINING THE THICKNESS OF SOIL AND PARAFFIN DEPOSIT LAYER IN OIL PIPELINE | 0 |
|
SU1536159A1 |
METHOD FOR NON-DESTRUCTIVE CONTROL OF PARAFFIN CONCENTRATION IN OIL FLOW BASED ON RADIOISOTOPIC RADIATION | 2020 |
|
RU2744315C1 |
METHOD FOR DETERMINING VALUE OF DEPOSITS ON INNER SURFACE OF PIPELINE AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2439491C1 |
METHOD FOR DETERMINATION OF THICKNESS OF DEPOSITS ON INNER SURFACE OF PIPELINE | 2019 |
|
RU2700349C1 |
METHOD OF DETERMINING PLACES OF ASPHALT-RESINOUS, PARAFFIN AND OTHER DEPOSITS IN PIPELINE, AS WELL AS DENTS AND CONSTRICTIONS THEREIN | 2021 |
|
RU2768135C1 |
METHOD OF DETERMINING THICKNESS OF PARAFFIN DEPOSIT LAYER IN OIL PIPELINE | 0 |
|
SU312534A1 |
OBJECTS CONTROL THERMOGRAPHIC METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2659617C1 |
DEVICE AND METHOD FOR DEPOSIT THICKNESS MEASUREMENT | 2010 |
|
RU2518017C2 |
Authors
Dates
2012-04-27—Published
2009-12-30—Filed