FIELD: construction.
SUBSTANCE: dam dike consists of wire-wrapped mats made of bags filled with local ground. Bags are connected with each other by means of metal wire and are laid in layers in tight rows to the cages top of rectangular prismatic framing that consists of wooden laced crib elements. Inside framing, along traced cages gabion nets are strained. They are interconnected and attached to elements of wooden laced cribs. At the base and on each side of framing cages light faggots are laid forming tight one-layer rows. At the base faggots are laid horizontally in direction of dam dike, and on each side - vertically while being attached to gabion net. Around dam dike head wooden piles are driven in they are connected with each other and with gabion mats by reinforcing wire attached to anchors emplaced in bank slope beyond its paving.
EFFECT: reduction of material costs for construction and promotion of recovery of water protection green zones along water beds.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BIO-POSITIVE SPUR DIKE ERECTION | 2006 |
|
RU2319805C2 |
DIKE DAM OF BIOPOSITIVE DESIGN | 2009 |
|
RU2449079C2 |
METHOD FOR BIO-POSITIVE SHORE REVETMENT | 2006 |
|
RU2319806C2 |
COASTAL FIXTURE FROM FASCINES AND GABION METS OF BIOPOSITIVE DESIGN | 2014 |
|
RU2565738C1 |
COMBINED SLOPE CONSOLIDATION DEVICE | 2005 |
|
RU2321702C2 |
DAM OF BIOPOSITIVE DESIGN | 2010 |
|
RU2451130C2 |
METHOD TO ERECT COASTAL SUPPORT FROM FASCINES OF BIOPOSITIVE DESIGN | 2014 |
|
RU2569828C1 |
ANTIEROSION STRUCTURE OF BIOPOSITIVE DESIGN FOR RECOVERY OF RAVINES | 2014 |
|
RU2565264C1 |
METHOD FOR ERECTING A RETAINING WALL OF A COMBINED STRUCTURE TO PROTECT COASTAL ZONES FROM EROSION | 2022 |
|
RU2801750C1 |
MANUFACTURING METHOD OF HEAVY FASCINES OF BIOPOSITIVE CONSTRUCTION | 2008 |
|
RU2369687C1 |
Authors
Dates
2008-10-20—Published
2006-04-10—Filed