FIELD: construction.
SUBSTANCE: method to manufacture a technological wall of a foundation put by means of submersion of a row of rabbets into soil and subsequent installation of facilities to protect against soil collapse into the foundation pint between them. The operation for installation of facilities to protect against soil collapse into the foundation pit is carried out by at least partial submersion of a row of double-phased thermal siphons into soul at the outer side from the rabbets relative to the foundation pit, at the depth that is larger than that of the foundation pit, and by subsequent cooling of upper sections of thermal siphons until a solid frozen wall is formed that contacts with rabbets.
EFFECT: increased strength of the wall under bending loads at the side of soil, provides for impermeability for underground waters.
7 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF REPAIR TRENCH FOR REPLACEMENT OF DEFECT SECTION OF PIPELINE | 2019 |
|
RU2720893C1 |
STAY-IN-PLACE FORM FOR ERECTION OF WALLS IN SOIL | 2011 |
|
RU2482243C1 |
METHOD OF ERECTING TONGUE-AND-GROOVE ENCLOSURE DURING MAIN PIPELINE OPERATIONS AND SHEET COLLAPSIBLE ENCLOSURE FOR CONSTRUCTION OF PIT | 2018 |
|
RU2705674C2 |
THREE-DIMENSIONAL FRAME HAVING CELLULAR STRUCTURE FOR GROUND CONSOLIDATION (VARIANTS) AND BAND FOR FRAME PRODUCTION (VARIANTS) | 2006 |
|
RU2323301C2 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD OF ERECTION OF UNDERGROUND STRUCTURES ALONG RIVER BED OR CANAL | 2018 |
|
RU2686206C1 |
HYDRAULIC STRUCTURE AND METHOD OF ITS INSTALLATION | 2023 |
|
RU2820942C1 |
METHOD OF TRANSPORT OVERCOMING OF WATER OBSTACLE IN AREAS OF ETERNAL CONGELATION | 2016 |
|
RU2641810C2 |
FIELD DEMOUNTABLE FORTIFICATION STRUCTURE | 2019 |
|
RU2721552C1 |
Authors
Dates
2012-05-20—Published
2007-12-29—Filed