METHOD FOR DEPLOYING INTEGRATED COMPLETION CASE IN ONE RIDE AND COMPLETION SYSTEM Russian patent published in 2023 - IPC E21B43/10 E21B34/16 

Abstract RU 2799592 C2

FIELD: well completion systems.

SUBSTANCE: group of inventions relates to a method for deploying an integral well completion string in one run and to a single-run well completion system. The method for deploying an integrated well completion string in one run includes the steps of: lowering the integral well completion string into the well as an integral unit; blocking the flow of fluid radially outward through the self-contained filter from the internal passage of the integral completion string into the annulus formed between the integral completion string and the wellbore when the integral completion string is lowered into the well; and providing bi-directional radial fluid flow through the self-contained screen after running the integral completion string into the well. The integral completion string comprises a surface-controlled downhole safety valve (SCSSV) configured to block the uncontrolled flow of fluid within the internal passage up it, a production packer configured to fix the integral completion string by its installation in the cased part of the wellbore and located downhole relative to the SCSSV located uphole relative to the production packer, a self-contained filter located downhole relative to the production packer, and a flush shoe located downhole relative to the autonomous filter and configured to provide fluid flow from the internal passage of the integral completion string into the annular space, with the possibility of blocking the flow of fluid from the annular space into the internal passage of the integral completion string, as well as with the possibility of sealing the internal passage of the integral completion string with the possibility of creating or increasing pressure inside the internal passage of the integral completion string for installation operational packer.

EFFECT: eliminating the need to run additional tools, reducing the time of work in the well to complete it.

8 cl, 7 dwg

Similar patents RU2799592C2

Title Year Author Number
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL 2010
  • Skits Krejg
  • Dzhill Gari E.
  • Makhdi Abbas
RU2553705C2
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1
PRESSURE LEAKPROOFNESS TEST OF WELL COMPLETION UNIT INSTALLED IN ONE DESCENT AND LIFTING TRIP 2018
  • Franklin, Andrew
  • Murdoch, Euan
  • Munro, Christopher
RU2766214C2
METHODS AND ASSEMBLY FOR ISOLATION OF ZONES IN WELL BOREHOLE 2012
  • Braussard Dzhon
  • Natli Brajan
  • Klark Ross
  • Natli Kim
RU2535320C2
DEVICE AND METHOD FOR UNDERGROUND WELL COMPLETION 2005
  • Patel Dinesh R.
RU2307920C1
METHOD AND DEVICE FOR DRILLING AND COMPLETION AT PROGRAMMED PRESSURE AND PROGRAMMED PRESSURE GRADIENT 2008
  • Daunton Dzheffri K.
  • Kkhan Vagar
RU2455453C2
WELL COMPLETION IN ONE PRODUCTION STRING RUNNING 2003
  • Luis Ehdvin K.
  • Orchard Antoni Dzh.
  • Jeo Dzhozef K. Kh.
  • Krittsler Dzhejms Kh.
  • Chapman Uolter R.
  • Kholt Dzhejms Kh. Dzhr.
RU2349735C2
COMPLETION DEFLECTOR FOR INTELLIGENT WELL COMPLETION 2014
  • Stil Devid Dzh.
RU2649711C1
DEVICES WITH COATINGS FOR OPERATION OF OIL AND GAS WELLS 2009
  • Bailey Jeffrey R.
  • Biediger Erika A. Ooten
  • Bangaru Narasimha-Rao Venkata
  • Ozekcin Adnan
  • Jin Hyunwoo
  • Yen Charles Shioa-Hsiung
  • Barry Michael D.
  • Herker Michael T.
  • Ertas Mehmet Deniz
RU2529600C2

RU 2 799 592 C2

Authors

Trisal Krishna

Afandiev Farid

Molyavi Said

Afanaseva Ilyana Sergeevna

Dates

2023-07-07Published

2019-01-23Filed