WELL SYSTEM AND METHOD FOR PROCESSING UNDERGROUND FORMATION Russian patent published in 2007 - IPC E21B43/00 E21B43/16 

Abstract RU 2293842 C2

FIELD: technology for processing underground formations.

SUBSTANCE: well system contains equipment for completion, positioned in borehole of well for forcing extracted liquid substance, a system of pipes, connected to completion equipment, bypass device, connected to system of pipes for moving liquid for processing well bypassing completion equipment, and draining valve. The latter is positioned with possible interaction with system of pipes and bypass device for selectively guiding stream of liquid for processing well through system of pipes to bypass device or stream of extracted liquid from completion equipment through system of pipes. In accordance to method, draining valve is positioned in system of pipes for feeding liquid substance. Channel for passage of processing liquid is connected to system of pipes. Draining valve is used for blocking stream in system of pipes while simultaneously providing for passage of stream through the channel for passage of processing liquid. System for forcing liquid substance in well borehole with equipment for completion, mounted in well borehole on system of pipes, contains draining valve, controlled for providing possible passage of stream of extracted liquid substance through system of pipes, and bypass channel, letting liquid substance into draining valve for isolation of completion equipment from well processing liquid injected through draining valve.

EFFECT: increased efficiency when processing underground formations.

3 cl, 5 dwg

Similar patents RU2293842C2

Title Year Author Number
METHOD FOR DEPLOYING INTEGRATED COMPLETION CASE IN ONE RIDE AND COMPLETION SYSTEM 2019
  • Trisal Krishna
  • Afandiev Farid
  • Molyavi Said
  • Afanaseva Ilyana Sergeevna
RU2799592C2
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
PIPE STRING SYSTEM FOR SELECTIVE REGULATION OF FLUID FLOWS WITH VARIABLE SPEEDS IN WELLS FORKING FROM ONE COMMON WELLBORE 2011
  • Tandzhet Brjus Eh.
RU2556560C2
DEVICE AND METHOD FOR UNDERGROUND WELL COMPLETION 2005
  • Patel Dinesh R.
RU2307920C1
WELL COMPLETION IN ONE PRODUCTION STRING RUNNING 2003
  • Luis Ehdvin K.
  • Orchard Antoni Dzh.
  • Jeo Dzhozef K. Kh.
  • Krittsler Dzhejms Kh.
  • Chapman Uolter R.
  • Kholt Dzhejms Kh. Dzhr.
RU2349735C2
CONTROL FACILITIES EMPLOYED AT PRODUCTION OF FLUIDS BY HEATING AND OPERATED IN REAL TIME IN PRODUCING WELL 2007
  • Uolford Merrik
RU2341652C1
METHODS AND ASSEMBLY FOR ISOLATION OF ZONES IN WELL BOREHOLE 2012
  • Braussard Dzhon
  • Natli Brajan
  • Klark Ross
  • Natli Kim
RU2535320C2
COMPATIBLE WITH CABLE AND CONTROLLED BY A NON-LIFT METHOD, CONFIGURED TO INTERACT WITH ANNULAR SPACE SYSTEM FOR USE AND ELIMINATION OF UNDERGROUND WELL 2012
  • Tandzhet Bryus E.
RU2689933C2
DOWNHOLE SYSTEM WITH STRING HAVING ELECTRIC PUMP AND INDUCTIVE COUPLER 2007
  • Patel Dinesh R.
RU2455460C2
CONSTRUCTION OF WELL WITH PRESSURE CONTROL, OPERATIONS SYSTEM, AND METHODS APPLIED TO OPERATIONS WITH HYDROCARBONS, STORAGE AND PRODUCTION BY DISSOLUTION 2011
  • Tandzhet Brjus Eh.
RU2563865C2

RU 2 293 842 C2

Authors

Gud Piter A.

Verkemer Klod Zh.

Dates

2007-02-20Published

2005-01-19Filed