FIELD: oil and gas production.
SUBSTANCE: development system includes productive multi-hole ring holes with main vertical bore and side bores the horizontal areas of which in productive formation are directed symmetrically in radial directions in relation to the main bore, and vertical injection wells located by even square five-spot pattern of water flooding. According to the invention in the centre of the square there is a ring productive well, and in the four corners of the square - vertical injection wells. The distance between neighbouring productive wells is taken larger than the average size of the zone of permeability chaotic changing. The horizontal areas of side bores of adjacent ring holes are symmetrically turned relatively one another.
EFFECT: increase of production rate of zonary-heterogeneous formations regarding permeability, reduction of drill works and well operation cost.
1 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR FAN-LIKE INTERVAL-BY-INTERVAL OPERATION OF OIL PRODUCING WELLS | 2009 |
|
RU2419717C1 |
METHOD OF FURTHER DEVELOPMENT OF OIL DEPOSIT | 2015 |
|
RU2600255C1 |
METHOD OF NONSTATIONARY EXTRACTION OF OIL FROM ZONAL NONHOMOGENEOUS FORMATION AS TO PERMEABILITY | 2011 |
|
RU2485298C1 |
METHOD OF EVALUATION OF SPACE DISTRIBUTION OF OIL SATURATED REGIONS IN WATERED BEDS | 2007 |
|
RU2343274C1 |
METHOD FOR RECOVERY OF RESIDUAL OIL RESERVES | 2012 |
|
RU2511151C2 |
METHOD OF DEVELOPMENT OF OIL FIELD WITH NONUNIFORM RESERVOIRS AND DIFFICULTLY RECOVERABLE OIL RESERVES | 2002 |
|
RU2215128C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2188311C1 |
METHOD OF DEVELOPMENT OF OIL POOL AT PRESENCE IN PRODUCTIVE CUT OF SUPERCOLLECTORS | 2008 |
|
RU2386020C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2580562C1 |
METHOD FOR EXTRACTING AN OIL DEPOSIT | 2002 |
|
RU2243364C2 |
Authors
Dates
2012-07-10—Published
2011-01-19—Filed