FIELD: mining.
SUBSTANCE: depth is calculated based on difference in time of arrival to the furnace of the first tube wave propagating directly upwards in the well shaft and the second tube wave originally passing downwards and then reflected upwards. Tube waves are created by means of a canister provided with possibility of implosion at some pressure. After the canister is introduced to delivery pipeline on ground device, it is moved to the bottom hole by gravity force and with pumped fluid medium. When the canister reaches the depth at which the allowable pressure has been exceeded, it will implode and tube waves will be created. Analyser on the ground surface detects tube waves by means of sensors and creates the pressure profile relative to the well depth. Canisters can be acoustically marked with control of volume and size of the hole for creation of tube waves having certain differences in frequency and amplitude. Canisters can be provided for creation of multiple implosions as well. Canisters can also be equipped with release and cocking mechanisms, and they can create tube waves under influence of the conditions different from the certain pressure.
EFFECT: improving reliable determination of the depth at which the condition in the well shaft appears.
35 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE TO TREAT BOREHOLE FILLED WITH FLUID | 2008 |
|
RU2414596C1 |
SHAPED-CHARGE IMPLOSIVE MECHANISM | 1995 |
|
RU2084616C1 |
METHOD AND SYSTEM FOR DETECTION IN OBJECT OF OBJECTS REFLECTING HYDRAULIC SIGNAL | 2016 |
|
RU2709853C1 |
HOLE-MAKING METHOD AND SYSTEM USING HIGH-POWER LASER | 2009 |
|
RU2522016C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2658400C1 |
DEVICE AND METHOD FOR PERFORMING TESTS FOR DETERMINING FORMATION VOLTAGE IN UNSETSED AREA OF WELLBORE | 2019 |
|
RU2761075C1 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2664989C1 |
DOWNHOLE DEVICE AND METHOD | 2013 |
|
RU2638200C2 |
SYSTEM (VERSIONS) AND DETECTION METHOD OF ACOUSTIC SIGNALS SUPPLIED FROM WELL | 2008 |
|
RU2446279C2 |
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE | 2005 |
|
RU2310067C2 |
Authors
Dates
2012-07-20—Published
2008-03-26—Filed