FIELD: mining.
SUBSTANCE: according to method, at least one element is provided, including performance and completion of the first treatment operation at the element and using unit of data processing to determine whether the first treatment operation was successful or not by initiation of tube wave in borehole, perception of borehole response towards tube wave and calculation of element condition on the basis of perceived response. Having determined that the first treatment operation was successful, the second treatment operation is performed, or, if the first treatment operation is not successful, the first repair operation is selected on the basis of perceived response, and the first repair operation is performed.
EFFECT: improved efficiency of solutions of inventions.
18 cl, 10 dwg