FIELD: mining.
SUBSTANCE: method for vertical borehole reconstruction includes the following stages: mounting of water-proof and backfill formwork, reinforcement mounting, filling of backfill gap between the formwork and borehole lining by compound on the base of aqua-gel and its following displacement by concrete-sand solution. Note that backfill gap is filled through sectoral-perforated pipes structurally included into the metal formwork.
EFFECT: improvement of water-proof properties of borehole lining.
9 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF THE MINE SHAFT WITH A TUBING SUPPORT RECONSTRUCTION | 2017 |
|
RU2655712C1 |
VAULT LINING OF AN UNDERGROUND STRUCTURE | 0 |
|
SU1441015A1 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
SHAFT LINING, COMPLEX FOR ITS ERECTION AND METHOD OF ITS ERECTION | 2012 |
|
RU2502873C1 |
SECTIONAL LINING FOR UNDERGROUND WORKING | 1997 |
|
RU2109139C1 |
METHOD OF CONSTRUCTING PASSAGES IN DEEP LEVEL UNDERGROUND RAILWAY PYLON STATIONS | 2018 |
|
RU2691420C1 |
METHOD TO ELIMINATE WATER LEAKAGES IN UNDERGROUND ENGINEERING UTILITIES | 2011 |
|
RU2473745C1 |
VERTICAL EXCAVATION LIQUIDATION METHOD | 2004 |
|
RU2278267C1 |
Authors
Dates
2012-08-20—Published
2011-01-20—Filed