FIELD: construction.
SUBSTANCE: invention relates to construction of deep level underground railway pylon stations and can be used for passage in clay soils of semi-solid and solid consistency. Proposed method comprises the following stages: during driving of central station tunnel in zones above passages it is drilled with drilling rig of the well till contact with lining of track station tunnel. Steel pipes are installed in wells and filled with cement-sand solution. Then the upper tubes of temporary filling of the opening frame are dismantled. Using the dismantling machine, a calotte is passed from the formed opening along the whole length of the passage with additional support made of the H-shaped frames. Central and tray tubes of temporary filling of the opening frame are dismantled. Using the dismantling machine, the soil is developed in the central and tray sections of the passage with fixation of the walls of the opening with cross braces from steel pipes, which are filled with cement-sand mortar. Forming is installed and concreting passage in one step.
EFFECT: technical result is minimization of day surface deposits and high efficiency of operations.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
METHOD OF CONSTRUCTING DEEP UNDERGROUND STATION ON OPERATING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2825811C1 |
METHOD FOR CREATING UPPER CROSS-CUT ABUTTING JOINT OF APPROACH TUNNEL TO EXISTING METROPOLITAN PILOT STATION CONSTRUCTED WITHOUT INTERRUPTION OF STATION OPERATION | 2020 |
|
RU2745310C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
Authors
Dates
2019-06-13—Published
2018-06-04—Filed