FIELD: machine building.
SUBSTANCE: angular panel comprises main section arranged at tanker angular region. Note here that main section inner surface has curvature and strain dissipation section including element of curvature and configured to decrease concentrated strain of said main section. Outer surface of element of curvature is engaged with inner surface of main section.
EFFECT: dissipation of strains, ruled out crack formation.
19 cl, 14 dwg
Title | Year | Author | Number |
---|---|---|---|
DESIGN OF CARGO TANK INSULATION FOR TRANSPORTATION OF LIQUEFIED NATURAL GAS AND METHOD OF ITS MANUFACTURING | 2009 |
|
RU2457391C2 |
DEVICE AND METHOD OF STRIPPING GAS PROCESSING AT LIQUEFIED NATURAL GAS TANKER WITH ELECTRIC PROPELLER PLANT AND RELIQUEFACTION FUNCTION | 2010 |
|
RU2481234C1 |
SHIP FOR TRANSPORTATION OF LIQUEFIED NATURAL GAS AND METHOD OF ITS CONSTRUCTION | 2019 |
|
RU2727768C1 |
SEALED AND HEAT INSULATED CARGO TANK, INTEGRATED INTO BEARING STRUCTURE | 2012 |
|
RU2588920C2 |
HYBRID FUEL SUPPLY SYSTEM AND METHOD FOR ENGINE OF VESSEL | 2013 |
|
RU2602714C2 |
CATAMARAN-TYPE FLOATING NATURAL GAS LIQUEFACTION PLANT | 2010 |
|
RU2497711C1 |
VESSEL FOR CONDENSED GAS TRANSPORTATION | 2007 |
|
RU2335426C1 |
METHOD OF CRYOGENIC GAS STORAGE AND TRANSPORTATION | 2007 |
|
RU2334646C1 |
DISPLAY MODULE AND DISPLAY SYSTEM | 2011 |
|
RU2568576C2 |
FACILITY FOR PRODUCTION OF COMPACTED IRON OUT OF REDUCED MATERIALS CONTAINING FINE GRAIN IRON OF DIRECT REDUCTION AND INSTALLATION FOR PRODUCTION OF CAST IRON WHEREIN THIS FACILITY IS IMPLEMENTED | 2005 |
|
RU2366720C2 |
Authors
Dates
2012-08-20—Published
2009-06-19—Filed