FIELD: construction.
SUBSTANCE: wooden elements are tightly laid vertically into two dug trenches, the length of which is equal to the length of a section of a technological wood track, with the width of the gauge part equal to 1.0-1.1 m, depth of 0.5-0.8 m, the distance between trenches is 0.8-1.0 m.
EFFECT: wooden elements are low-quality timber and felling debris left after logging works.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO BUILD SECTION OF TECHNOLOGICAL TIMBER ROAD | 2013 |
|
RU2539473C1 |
METHOD FOR CONSTRUCTION OF SECTION OF TECHNOLOGICAL FOREST ROAD | 2017 |
|
RU2654930C1 |
CONSTRUCTION METHOD FOR PROCESS WOOD TRANSPORT ROAD | 2015 |
|
RU2593680C1 |
METHOD OF SECTION CONSTRUCTION OF PROCESS TIMBER ROAD | 2018 |
|
RU2689963C1 |
PROCESS LOGGING ROAD | 2018 |
|
RU2690243C1 |
METHOD FOR CONSTRUCTION OF ROAD EMBANKMENTS ON WATERWEET AND PERMAFROST SUBSTRATES | 2022 |
|
RU2785985C1 |
METHOD OF EXPLOITATION FOREST AREAS OF OIL-AND-GAS PIPELINE ROUTES AND POWER TRANSMISSION LINES | 2012 |
|
RU2488992C1 |
LOGGING METHOD | 1998 |
|
RU2149536C1 |
METHOD OF DEVELOPMENT OF FOREST AREAS OF OIL-AND-GAS PIPELINE ROUTES AND POWER TRANSMISSION LINES | 2012 |
|
RU2489844C1 |
TECHNOLOGICAL ROAD FOR TIMBER TRUCKS | 2020 |
|
RU2749004C1 |
Authors
Dates
2012-08-27—Published
2011-02-10—Filed