FIELD: construction.
SUBSTANCE: invention can be applied to construction of wood transport road after ride clearance. Creation of reinforcing layer by crushing felling debris and undergrowth (low forest cover) upon sawed flush stumps, remaining after ride clearance, with bulldozer with V-shaped dump trailer, thereby producing bearing layer on entire width of road, provides high carrying capacity of entire surface of ground bed that makes it possible to increase strength of road due to load distribution along formed reinforcement structure, and provides its operating life, eliminating destruction of road when vehicles go to edge.
EFFECT: technical result is recycling residues of logging activity by construction of process wood transport road upon sections remained after ride clearance, improved environmental friendliness, and reduced fire hazard of this forest area, higher bearing capacity of road.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO BUILD SECTION OF TECHNOLOGICAL TIMBER ROAD | 2013 |
|
RU2539473C1 |
METHOD OF SECTION CONSTRUCTION OF PROCESS TIMBER ROAD | 2018 |
|
RU2689963C1 |
METHOD FOR CONSTRUCTION OF SECTION OF TECHNOLOGICAL FOREST ROAD | 2017 |
|
RU2654930C1 |
PROCESS LOGGING ROAD | 2018 |
|
RU2690243C1 |
METHOD FOR CONSTRUCTION OF ROAD EMBANKMENTS ON WATERWEET AND PERMAFROST SUBSTRATES | 2022 |
|
RU2785985C1 |
METHOD TO CONSTRUCT SECTION OF TECHNOLOGICAL WOOD TRACK | 2011 |
|
RU2459899C1 |
METHOD OF BUILDING TECHNOLOGICAL PASSAGEWAY ALONG MAINS ROUTE (VERSIONS) | 2003 |
|
RU2221953C1 |
METHOD OF ERECTION OF TECHNOLOGICAL PASSAGE ALONG PIPE LINE ROUTE (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2220350C1 |
METHOD FOR WOODLAND MANAGEMENT IN PLAIN ECONOMICALLY EXPLOITED SOFTWOOD AND HARDWOOD | 2005 |
|
RU2311018C2 |
METHOD FOR EXECUTION OF LOGGING WORKS | 2008 |
|
RU2374829C1 |
Authors
Dates
2016-08-10—Published
2015-06-10—Filed