FIELD: construction.
SUBSTANCE: wood elements are densely laid horizontally, perpendicularly to the axis of the road in the form of transverse deck into dug trenches, along the length equal to the width of the track of the technological timber road, with depth of 1.0-1.5 m, the distance between trenches is equal to 0.8-1.0 m, which are filled by drained material (sand), as wood elements they use low-quality timber and logging residues left after opening cutting through.
EFFECT: improved water-heat regime of a timber road by use of short sections of low-quality wood and logging residues after opening cutting through as a capillary breaking gasket, increased service life of roads.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF SECTION OF TECHNOLOGICAL FOREST ROAD | 2017 |
|
RU2654930C1 |
METHOD OF SECTION CONSTRUCTION OF PROCESS TIMBER ROAD | 2018 |
|
RU2689963C1 |
CONSTRUCTION METHOD FOR PROCESS WOOD TRANSPORT ROAD | 2015 |
|
RU2593680C1 |
METHOD TO CONSTRUCT SECTION OF TECHNOLOGICAL WOOD TRACK | 2011 |
|
RU2459899C1 |
PROCESS LOGGING ROAD | 2018 |
|
RU2690243C1 |
METHOD FOR CONSTRUCTION OF ROAD EMBANKMENTS ON WATERWEET AND PERMAFROST SUBSTRATES | 2022 |
|
RU2785985C1 |
TECHNOLOGICAL ROAD FOR TIMBER TRUCKS | 2020 |
|
RU2749004C1 |
PROCESS LOGGING ROAD | 2019 |
|
RU2726709C1 |
METHOD OF BUILDING TECHNOLOGICAL PASSAGEWAY ALONG MAINS ROUTE (VERSIONS) | 2003 |
|
RU2221953C1 |
CELL STRUCTURE OF ROAD BED | 2008 |
|
RU2360062C1 |
Authors
Dates
2015-01-20—Published
2013-07-09—Filed