FIELD: civil engineering. SUBSTANCE: drill-mixer is deepened in soil with concurrent supply of clay mud to rock- fracturing tool in non-sagging stratum, and to nozzles of drill-mixer in non-sagging stratum down to the design pile depth. Cement slurry is fed through drill-mixer nozzles when withdrawn. Before mixing cement with water in slurry-mixer the cement is milled additionally in wet condition. Cement is aftermilled with sand or other inert filler before introducing in soil with clay particles exceeding 30 % in non-sagging stratum. EFFECT: increased bearing capacity of the piles like this. 2 cl, 5 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| DEVICE FOR ERECTING PILES IN SOFT GROUND | 1993 | 
 | RU2040642C1 | 
| METHOD FOR RECONSTRUCTION OF BUILDINGS, CONSTRUCTIONS | 1993 | 
 | RU2065001C1 | 
| METHOD OF MANUFACTURE OF UNDERGROUND STRUCTURES FROM GROUTED SOIL | 1992 | 
 | RU2008396C1 | 
| DEVICE FOR INSTALLATION OF PILES IN GROUND | 1993 | 
 | RU2049855C1 | 
| COMBINED PILE | 2023 | 
 | RU2828923C1 | 
| VIBRATION DEVICE FOR ERECTING BEARING-AND-FENCING STRUCTURES IN GROUND | 2000 | 
 | RU2173373C1 | 
| METHOD FOR ERECTION OF BEARING-CLADDING ANTIFILTRATION STRUCTURES IN SOIL AND DEVICE FOR ITS REALISATION | 2008 | 
 | RU2378453C1 | 
| METHOD OF PILED CONSTRUCTION IN TRANSIENT SOILS UNDER CONDITIONS OF DENSE URBAN BUILDING | 2018 | 
 | RU2686788C1 | 
| METHOD OF DRILL-INJECTION STILT FORMATION | 2006 | 
 | RU2327007C1 | 
| PRECAST PILE AND METHOD OF ITS ARRANGEMENT | 2001 | 
 | RU2204652C1 | 
Authors
Dates
1996-02-20—Published
1993-11-15—Filed