FIELD: construction.
SUBSTANCE: method includes serial making of two rows of piles, the first one is made of bearing-cladding filling piles, which are arranged with gap, the second one is parallel in zone of the first row piles closure, at the same time in wells of the second row a monitor is serially installed with nozzles, through which gaps between piles of the first row are sealed by directed action of mortar jet. Piles of the first row are arranged with gap equal to 0.1-0.6 of their diametre and distance from axis of the first row piles to axis of piles of the second 0.5-1.0 diametre of the first row. Nozzles of monitor are arranged at the angle of 0°-90° to vertical axis of monitor and at the angle of 0°-180° in horizontal plane.
EFFECT: reduction of technological cycle, increased reliability and quality in development of tight antifiltration structure by creation of cement-soil element of non-cylindrical shape.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO DETERMINE PARAMETERS OF PILLARS ERECTED IN SOIL BY METHOD OF JET GROUTING | 2011 |
|
RU2461682C1 |
METHOD FOR MAKING CEMENT/SOIL PILES IN CAVED-IN SOILS | 1993 |
|
RU2054502C1 |
CAST-IN-PLACE PILE AND METHOD OF CONSTRUCTING SAME | 0 |
|
SU1131973A1 |
PROCESS OF ERECTION OF ENCLOSING WALL IN GROUND | 2001 |
|
RU2204656C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2303102C1 |
DEVICE FOR ERECTING PILES IN SOFT GROUND | 1993 |
|
RU2040642C1 |
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE | 2001 |
|
RU2211283C1 |
METHOD FOR ERECTION OF UNDERGROUND STRUCTURES | 1997 |
|
RU2094567C1 |
METHOD OF COMBINED IN SITU PILE MANUFACTURING | 2007 |
|
RU2334049C1 |
Authors
Dates
2010-01-10—Published
2008-05-04—Filed