FIELD: electricity.
SUBSTANCE: circuit comprises at least two sources of supply, circuits of supply inputs arranged via T-junctions from breakers with automatic load transfer (ALT), a switchgear 10(6) kV, comprising at least two sections of busbars (sections). These sections are supplied with the help of T-junctions from input breakers of autonomous mutually redundant sources of supply, operating separately, since some input breakers are normally off; at the same time ALT is carried out between normally on and normally off input breakers of each section.
EFFECT: increased reliability of supply and efficiency of protection and reduced costs for construction of power plants.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF POWER SUPPLY CONTROL FOR INDUSTRIAL POWER DISTRICT WITH SOURCES OF DISTRIBUTED GENERATION AT SHORT-CIRCUIT ON RESERVED SECTION OF SUBSTATION BUSES | 2018 |
|
RU2692758C1 |
SYSTEM FOR SUPPLYING ELECTRIC POWER TO SUBCIRCUITS OF COMPLEX MESHED LOW-VOLTAGE NETWORK | 0 |
|
SU1157611A1 |
METHOD FOR COMBINED INHIBIT OF AUTOMATIC SWITCHOVER FOR PERMANENT FAULTS AND VOLTAGE FALLS | 2007 |
|
RU2343617C1 |
0 |
|
SU1670741A1 | |
METHOD FOR POWER SUPPLY TO HYDRAULIC STRUCTURES | 2002 |
|
RU2219629C1 |
ELECTRIC ENERGY TRANSMISSION SYSTEM | 2011 |
|
RU2484571C1 |
MODULAR DISTRIBUTION TRANSFORMER SUBSTATION | 2002 |
|
RU2219631C1 |
HIGH-VOLTAGE SWITCH GEAR | 0 |
|
SU1774419A1 |
CONTROL METHOD OF FAILURE OF ACTIVATION OF DISCONNECT SWITCH OF BUSES FOR TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK | 2013 |
|
RU2551665C1 |
METHOD FOR INHIBIT OF AUTOMATIC SWITCHOVER FOR VOLTAGE FALLS UNDER CONDITIONS OF UNACCEPTABLE POWER SURGES | 2007 |
|
RU2343616C1 |
Authors
Dates
2012-12-10—Published
2010-09-22—Filed