FIELD: construction.
SUBSTANCE: invention relates to mining and mining-chemical industry and may be used to fence and protect a cracked rock massif from possible penetration of liquid solutions beyond the borders of the created screen, and to form a strong fixed section, excluding its collapse. The method includes drilling of parallel rows of wells or boreholes, arrangement of explosive charges in them in a staggered order with air or water gaps, their simultaneous camouflage blasting and placement of steel reinforcement ropes in remaining wells or boreholes with further filling with cement mortar. To form a collapse zone, initiation is used, at the same time, according to mathematical formulas depending on mining-geological and mining-technical conditions of such types of works production, the radius of the collapse zone - rcol and charge length ℓC are identified. The length of the air gap is equal to the charge length.
EFFECT: method makes it possible to increase efficiency and safety of these types of works due to optimal distribution of wells or boreholes along a contour of a created screen for specific mining-geological and mining-technical conditions.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMING WATERPROOF SCREEN IN CRACKED WATERCUT MOUNTAIN ARRAYS USING BRIDGING | 2013 |
|
RU2531410C1 |
METHOD TO OUTLINE MINES AND PILLARS IN CASE OF ROCK MASSIF BLASTING | 2011 |
|
RU2472105C1 |
METHOD OF EXPLOSIVE BREAKING OF BROKEN-UP ROCK MASS AT BREAKING ONTO BASSET | 1995 |
|
RU2101673C1 |
METHOD OF DRIVING A MINE WORKING | 0 |
|
SU817253A1 |
METHOD FOR SHOOTING OF ORES AND ROCKS ON UNDERGROUND MINING WORKS | 2011 |
|
RU2476819C1 |
METHOD FOR CARRYING OUT EXPLOSIVE OPERATIONS IN THE CIRCUIT ZONE OF QUARRY | 2022 |
|
RU2784839C1 |
METHOD OF BREAKAGE OF CRYSTAL-CONTAINING ROCKS BY EXTENDED CHARGES | 1998 |
|
RU2142610C1 |
METHOD FOR PRODUCTION OF CUTTING CAVITY | 2008 |
|
RU2379623C1 |
METHOD TO ARRANGE DEEP PROFILED GROOVES BY MEANS OF EXCAVATING EXPLOSIONS | 2012 |
|
RU2494341C1 |
ROCK STRENGTHENING METHOD | 0 |
|
SU1765433A1 |
Authors
Dates
2012-12-20—Published
2011-07-19—Filed