FIELD: mining.
SUBSTANCE: method to arrange profiled grooves as a result of excavating explosions includes tunnelling of mines, placement of explosive charges in them and explosion. Explosive charges are placed into several tiers along height, and charges are exploded in turn in direction from the upper tier to the lower one. Charges are exploded in each subsequent tier after formation of a blasting cone after explosion of charges of the previous tier. Charges are arranged into two or three tiers. The length of the line of the least resistance of each charge in each tier does not exceed 35 m. Tunnelling of mines for placement of charges is carried out individually for each charge.
EFFECT: improved performance of excavating explosions due to reduced consumption of explosives, scope of preparatory works related to tunnelling of mines, reduced dimensions of hazardous zones by throwout of rock pieces, seismic loads, intensity of air impact waves and propagation of toxic explosion gases.
4 cl, 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF THROWING DAM ACROSS CANYON BY BLAST | 1997 |
|
RU2122066C1 |
METHOD OF FORMATION OF EXTENSIVE SOIL OPENINGS BY EXCAVATING BLAST | 1995 |
|
RU2082948C1 |
METHOD FOR EXPLOSIVE DESTRUCTIONS OF ORE MASSIVES HAVING FRACTURED MESH STRUCTURE | 2002 |
|
RU2236590C2 |
METHOD FOR INSTALLATION OF BLASTING NETWORK OF SERIES OF OUTBURST CHARGES | 1998 |
|
RU2151373C1 |
METHOD FOR DRIVING OF RAISES WITH ROCK BREAKING BY DEEP-HOLE CHARGES | 2003 |
|
RU2271513C2 |
METHOD AT MINE WORKING THROUGH BURST-DANGEROUS SEAMS AND ROCKS | 0 |
|
SU1765462A1 |
EXPLOSIVE HOLLOW CHARGE | 2007 |
|
RU2356009C1 |
METHOD FOR CONTOUR BLASTING | 1999 |
|
RU2158413C1 |
METHOD FOR FORMATION OF CUT HOLLOW BY BLASTING | 1992 |
|
RU2033595C1 |
METHOD OF WORKING DRIVING | 1996 |
|
RU2126133C1 |
Authors
Dates
2013-09-27—Published
2012-02-29—Filed