FIELD: mining.
SUBSTANCE: prior to start of filling works, a recumbent side of a section in a mined space to be filled is poured with water to form an ice crust, afterwards the mined space is filled with crushed dead rocks or frozen briquettes from dressing tails. The ice crust makes it possible to apply self-flow filling at the minimum angle of inclination of a recumbent side equal to αmin.=arctgKfr, where Kfr - coefficient of friction as the filling material moves along the ice crust on the recumbent side of the mined space.
EFFECT: invention makes it possible to increase efficiency of filling works when mining sloping and inclined ore bodies in a cryolite zone due to expansion of a field of application of a self-flow method of dry filling material placement in a mined space by reduction of resistance to motion of this material on a recumbent side.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND MINING OF ORE DEPOSITS IN CRYOLITE ZONE | 2011 |
|
RU2471070C1 |
METHOD OF DEVELOPING OF STEEPLY DIPPING ORE DEPOSITS WITH UNDERGROUND ENRICHMENT | 2016 |
|
RU2652223C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF SLOPING AND INCLINED ORE BODIES OF LOW INTENSITY | 2010 |
|
RU2441162C1 |
METHOD FOR UNDERGROUND MINING OF VEIN DEPOSITS | 2011 |
|
RU2487998C2 |
METHOD FOR DEVELOPMENT OF INCLINED ORE BODIES | 2015 |
|
RU2597225C1 |
METHOD FOR DEVELOPMENT OF ORE DEPOSITS | 2012 |
|
RU2495245C1 |
METHOD FOR DEVELOPMENT OF LOW-POWER INCLINED ORE BODIES | 2018 |
|
RU2693807C1 |
METHOD OF FILLING OF ROOM WORKED-OUT SPACE IN MINERAL UNDERGROUND MINING | 2001 |
|
RU2215144C2 |
METHOD FOR UNDERGROUND THICK ORE BODY MINING | 2005 |
|
RU2323337C2 |
METHOD OF UNDERGROUND DEVELOPMENT OF THIN VEINS | 2010 |
|
RU2418167C1 |
Authors
Dates
2012-12-27—Published
2011-04-20—Filed