FIELD: mining industry; applicable in underground mining of blind mineral deposits. SUBSTANCE: method includes sinking from surface to deposit of raise and passage of filling material through raise to deposit worked-out space. Fill-raise for localization of room worked-out space with safety pad formed from filling material is sunk in deposit lying side at angle of inclination to surface exceeding angle of material internal friction. Mouth of fill-raise is located beyond zone of shifting of lying side rocks, and lower part of fill- raise is sunk with branching into two-three hoses depending on deposit thickness. Inspection workings are made for monitoring the conditions of worked out space and filling material beyond zone of influence of worked-out space. Minimal required thickness of safety pad in worked-out space is determined from offered relationship. EFFECT: reduced labor input, higher safety of work. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF MINERAL DEPOSITS | 2001 |
|
RU2204718C2 |
METHOD FOR FILLING AND PROTECTING EXCAVATED SPACE DURING SUBTERRANEAN EXCAVATION OF MINERAL DEPOSITS | 2002 |
|
RU2232900C2 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD OF MINERAL MINING UNDER CONDITIONS OF HIGH ROCK PRESSURE | 1999 |
|
RU2173386C2 |
METHOD FOR EXTRACTING MINED BLOCKS DURING SUBTERRANEOUS EXTRACTION OF BLIND ORE BODIES | 2001 |
|
RU2224891C2 |
METHOD FOR FILLING GOBS | 0 |
|
SU1802168A1 |
METHOD OF MINING BLIND OREBODIES UNDER PROTECTED OBJECTS | 1998 |
|
RU2147683C1 |
METHOD FOR DEVELOPMENT OF MINERAL DEPOSITS | 1996 |
|
RU2096617C1 |
METHOD FOR EXTRACTION OF STEEPLY DIPPING ORE BODIES OF SMALL AND MEDIUM THICKNESS AND FILLING OF WORKED OUT SPACES | 0 |
|
SU1819998A1 |
METHOD FOR STEEP ORE DEPOSIT DEVELOPMENT | 2004 |
|
RU2278972C1 |
Authors
Dates
2003-10-27—Published
2001-12-18—Filed