UNDERGROUND FORMATION EXCITATION METHOD Russian patent published in 2013 - IPC E21B43/25 

Abstract RU 2471977 C2

FIELD: oil and gas industry.

SUBSTANCE: method involves the following stages: a) the first tubular column is arranged in casing string; b) one packer is arranged immediately on far end of tubular column to isolate the first zone of the well from the second zone of the well; at that, the first zone is located from the second zone closer to surface along the well; c) continuous tubular column passing behind the end of the first tubular column to the second zone is arranged in the first tubular column; d) perforating tool connected to continuous tubular column is arranged; e) perforating tool is positioned in the second zone; f) casing string is perforated near perforating tool in the second zone; g) continuous tubular column is removed, including perforating tool, from the well; h) treatment fluid medium is pumped through the first tubular column under pressure that is sufficient for passage of the above fluid medium through at least one of perforation holes in the second zone for creation of hydraulic fracturing in the formation; i) granular material or sealing balls passing to cased well and insulating the perforated interval are pumped through the first tubular column; j) stages (e) - (h) are repeated, at which the other interval is perforated with the above tool in the second zone; k) stages (e) - (h) are repeated, at which the interval located above the previous interval is perforated with the above perforating tool.

EFFECT: increasing the efficiency of the method.

9 cl, 5 dwg

Similar patents RU2471977C2

Title Year Author Number
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
PROCEDURE AND DEVICE FOR INTRAWELL SELECTIVE COMMUNICATION BY MEANS OF FLUID MEDIUM 2007
  • Vesson Dehvid S.
  • Dzhordzh Kevin R.
  • Snajder Filip M.
RU2401936C1
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE 2003
  • Dzhonson Ehshli B.
  • Bermann Lourens A.
  • Jang Venbo
  • Dornbos Fokko Kh.K.
  • Uolton Jan S.
RU2352769C2
HYDRAULIC STRATUM FRACTURE METHOD 2007
  • Dasterkhoft Dejl
  • Braun Dehvid
  • Vogan Dzhejson
  • Ljuk Sehm
  • Talissi Majkl
RU2397319C2
MULTIZONE WELL COMPLETION METHOD AND SYSTEM (VARIANTS) 2005
  • Lopes De Kardenas Khorkhe
  • Ritlevski Gari L.
  • Khehkvort Mehtt'Ju R.
  • Uitsitt Dzhon R.
  • Garsia Khose F.
RU2310066C2
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
METHOD FOR WELL TREATMENT OF (VERSIONS) 2007
  • Klark V. E.
  • Bentli Dug
  • Deniels Dzhon
  • Fredd Kristofer N.
  • Miller Charlz
  • Lassek Dzhon
RU2587197C2

RU 2 471 977 C2

Authors

Fand'Jutas Dzhon

Dates

2013-01-10Published

2010-08-24Filed