FIELD: mining.
SUBSTANCE: geophysical tower is made in the form of a platform installed on a vehicle chassis with a mast fixed on it, a mechanism of mast displacement with a hydraulic drive and a hydraulically driven hoist with a hook suspension. In the rear part of the platform on rotary brackets of extended sliding supports, arranged in the form of hydraulic cylinders, there is a suspended working site installed, being put into working and transport positions by means of the mast displacement mechanism with the hydraulic drive and sliding supports of the working site.
EFFECT: higher efficiency of action by pulsating washing of a drilling mud at a well bottomhole.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR REMOTE SAFETY MONITORING DURING WIRELINE WELL SERVICES IN EXISTING GAS WELLS | 2022 |
|
RU2810668C1 |
MOBILE WELL SERVICING UNIT | 2018 |
|
RU2716674C1 |
MOBILE WELL REPAIR PLANT | 2003 |
|
RU2262583C2 |
INSTALLATION FOR DRILLING, TESTING AND REPAIR OF OIL AND GAS WELLS UPA-80 | 2007 |
|
RU2362868C1 |
LIFTING UNIT FOR REPAIR OF WELLS APRS-32/40 | 2019 |
|
RU2712990C1 |
HOIST UNIT FOR COMPLETION AND REPAIR OF OIL AND GAS WELLS UPA 60A | 2007 |
|
RU2362867C2 |
REPAIR-BORING AGGREGATE AP32/40 | 2007 |
|
RU2380512C2 |
DEVICE FOR ROUND TRIP OF WELL INSTRUMENTS | 1992 |
|
RU2041350C1 |
MOBILE REPAIR-DRILLING UNIT | 2002 |
|
RU2204680C1 |
AUTOMOBILE HYDRAULIC LIFT | 2001 |
|
RU2199484C2 |
Authors
Dates
2013-01-27—Published
2011-05-16—Filed