FIELD: mining.
SUBSTANCE: underground development method of the Elginsky coal deposit involves separation of the deposit into upper and lower formations, performance of paired tunnels and paired inclined working-outs, use of one branch of inclined working-outs and tunnels for coal transportation from loading points to coal-preparation plant, development of the deposit using an underground method sequentially in downstream order. Paired tunnels are performed on the lowest formation H2 of the northern deposit part to geological breakdown; cross galleries are made after geological breakdown out of tunnels transversely to the formation spread of the south-eastern part; those formations are opened with inclined shafts and worked out with a storeyed development system with coal transportation via inclined winzes and slopes to cross galleries, and then tunnels.
EFFECT: invention allows ensuring the efficiency of development of the south-eastern part of the deposit, complete extraction of coal and possibility of applying that method at any stage of the deposit development.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED OPENING AND COMBINED MINING OF ELGHINSKY COAL DEPOSIT | 2001 |
|
RU2208159C2 |
METHOD OF DEVELOPMENT OF ELGINSKIY COAL BASIN | 2007 |
|
RU2349753C2 |
METHOD OF DEVELOPMENT OF ORE DEPOSITS | 2007 |
|
RU2338879C1 |
METHOD FOR SELECTIVE DEVELOPMENT OF UPLAND MINERAL ESTATE RESERVES | 2010 |
|
RU2453700C2 |
METHOD OF OPENING SUITES OF STEEPLY DEEPING AND INCLINED SEAMS | 0 |
|
SU870713A1 |
METHOD OF UNDERGROUND MINING OF MINERAL SHEET DEPOSITS | 2000 |
|
RU2183272C2 |
COMPOUND DEVELOPMENT METHOD OF SERIES OF GENTLY SLOPING BEDS OF MINE FIELDS | 2009 |
|
RU2418166C1 |
METHOD OF STRIPPING AND WORKING DEPOSITS IN CONTOUR-ADJOINING GONES OF OPEN MINE | 0 |
|
SU1023085A1 |
METHOD OF EXPOSING AND MINING VEINS | 0 |
|
SU1752955A1 |
DEVELOPMENT METHOD OF SERIES OF BEDS | 2009 |
|
RU2436956C2 |
Authors
Dates
2013-02-10—Published
2011-07-13—Filed