FIELD: mining.
SUBSTANCE: method involves drilling, preparation and development of the thickest bed in descending order to the lowest horizon. Drilling and development of the rest beds is performed in ascending order using capital mine workings of transport and ventilation systems of the developed thick bed. Rock of driving of mine workings is arranged in mine workings of below lying extracted horizons.
EFFECT: reducing the costs for development of minefield; enlarging manufacturing capabilities.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BEDDED DEPOSIT DEVELOPMENT | 2006 |
|
RU2343284C2 |
METHOD FOR EXTRACTING SALT DEPOSITS | 2003 |
|
RU2235879C1 |
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
0 |
|
SU1566024A1 | |
METHOD FOR OPENING SUITE OF GENTLY DIPPING COAL SEAMS TENDING TO OUTBURST | 0 |
|
SU1768756A1 |
METHOD OF DEVELOPING AND MINING FORMATION OF THIN STEEP SEAMS DISPOSED TO SUDDEN OUTBURSTS OR ROCK BURST SHOCKS | 0 |
|
SU635248A1 |
METHOD OF DEVELOPING AND MINING A SUIT OF STEEP GAS-BEARING AND OUTBURST-HAZARDOUS SEAMS | 0 |
|
SU1242615A1 |
METHOD OF MINING A SUIT OF THIN AND MEDIUM-THICK STEEP COAL SEAMS | 0 |
|
SU1143842A1 |
COMBINED METHOD FOR MINING OF COAL SEAMSERIES | 1992 |
|
RU2039257C1 |
METHOD FOR COMBINED OPEN-UNDERGROUND EXTRACTION OF SLANTING COAL BEDS SET | 2002 |
|
RU2233378C1 |
Authors
Dates
2011-12-20—Published
2009-09-10—Filed